My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ROHL Networks, LP #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Responses
>
ROHL Networks, LP #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2021 10:07:13 AM
Creation date
1/7/2016 3:33:44 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Collins Ave. Utility Undergrounding
Bid No. (xx-xx-xx)
15-12-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• What is water depth? <br /> Please refer to the InfraMap Test Hole Inventory and Report dated December 1st, 2014 <br /> (included in Addendum No..4) for basic soil conditions and water levels. Water levels will <br /> vary according to the season and tides. <br /> • What is the Engineer estimate? <br /> An engineer's estimate is not available. <br /> • Is there a requirement for pull string when you install the conduit? <br /> Yes, that information is in the bid documents, Section 15060 Conduit and Fittings, Part <br /> 3.02.A.7 <br /> _ 1. 1_rern(J2" let <br /> • FPL Qualifications, etc.? ;'1T le'-_'= tvi' <br /> Contractor will need to provide a letter from the local FPL yard indicating that they have <br /> performed work for FPL in the past. In lieu of this letter the contractor must be able to show <br /> experience including representative examples in which they have installed underground <br /> conduit similar to that in FPL type projects. <br /> • Will FPL provide the conduits? <br /> FPL will supply all material necessary to complete their portionof this project. -All ,other <br /> conduit, pull boxes, light pole foundation components, etc. will be the responsibility of the <br /> contractor. <br /> • Is FPL in line with the schedule? <br /> Yes; FPL is on board with the schedule. <br /> r, <br /> r <br /> • The night work, is it five (5) nights a week? <br /> The work will occur on non-peak hours indicated on the Traffic Control Plans sheet C-156, <br /> Project Note No. 3. Five (5) nights per week, Sunday through Thursday. <br /> • <br /> • Is the Geotechnical Report on line? - . = "` ' - <br /> No Geotechnical report was performed. Please refer to the InfraMap Test Hole inventory <br /> and Report dated December 1st, 2014 (included in Addendum No. 4) for basic soil <br /> conditions and water levels. <br /> • Can you clarify the bid bond deposit? <br /> The bid bond deposit shall be equal to 5% of the total bid amount. <br /> • <br /> Monday, December 28. 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.