Laserfiche WebLink
• What is the scope of work for the Atlantic (Off-Collins) corridor? <br /> The limits of the Atlantic (Off-Collins) work are shown in Exhibit No. 1 (Exhibit No.1 has <br /> been made part of Addendum No. 4). The scope of work is similar to that of the work on <br /> Collins Ave. This work will be negotiated with the successful bidder. <br /> • Location of the staging area? <br /> The location of the staging area has been identified in Exhibit No. 2 (Exhibit No.2 has been <br /> made part of Addendum No. 4). <br /> END OF SECTION <br /> • <br /> Monday, December 28, 2015 <br />