My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 00700 - General conditions
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 00700 - General conditions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:55:02 PM
Creation date
1/25/2016 4:54:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />00700 - 17/38 <br /> <br />Documents, written notice thereof will be given to the CONTRACTOR prior to <br />starting any such other Work. <br /> <br />B. The CONTRACTOR shall afford each utility owner and other contractor who is a <br />party to such a direct contract (or the OWNER, if the OWNER is performing the <br />additional Work with the OWNER's employees) proper and safe access to the <br />site and a reasonable opportunity for the introduction and storage of materials <br />and equipment and the execution of such Work, and shall properly connect and <br />coordinate the Work with theirs. The CONTRACTOR shall do all cutting, fitting, <br />and patching of the Work that may be required to make its several parts come <br />together properly and integrate with such other Work. The CONTRACTOR shall <br />not endanger any Work of others by cutting, excavating, or otherwise altering <br />their Work and will only cut or alter their Work with the written consent of the <br />ENGINEER and the others whose Work will be affected. <br /> <br />C. If any part of the CONTRACTOR's Work depends for proper execution or results <br />upon the Work of any such other contractor or utility owner (or OWNER), the <br />CONTRACTOR shall inspect and report to the ENGINEER in writing any delays, <br />defects, or deficiencies in such Work that render it unavailable or unsuitable for such <br />proper execution and results. The CONTRACTOR's failure to report such delays, <br />defects, or deficiencies will constitute an acceptance of the other Work as fit and <br />proper for integration with the CONTRACTOR's Work except for latent or <br />nonapparent defects and deficiencies in the other Work. <br /> <br />7.2 COORDINATION <br /> <br />A. If the OWNER contracts with others for the performance of other Work on the <br />Project at the site, the person or organization who will have authority and <br />responsibility for coordination of the activities among the various prime <br />contractors will be identified in the Supplementary General Conditions, and the <br />specific matters to be covered by such authority and responsibility will be <br />itemized and the extent of such authority and responsibilities will be provided in <br />the Supplementary General Conditions. Unless otherwise provided in the <br />Supplementary General Conditions, neither the OWNER nor the ENGINEER <br />shall have any authority or responsibility in respect of such coordination. <br /> <br /> <br />ARTICLE 8 -- OWNER'S RESPONSIBILITIES <br /> <br />8.1 COMMUNICATIONS <br /> <br />A. The OWNER shall issue all its communications to the CONTRACTOR through <br />the ENGINEER. <br /> <br />8.2 PAYMENTS <br /> <br />A. The OWNER shall make payments to the CONTRACTOR as provided in <br />Paragraphs 14.5 and 14.8. <br /> <br />8.3 LANDS, EASEMENTS, AND SURVEYS <br />
The URL can be used to link to this page
Your browser does not support the video tag.