<br />01010 - 2/3 <br />1. Wherever possible, open trenches must be backfilled/plated, and barricades <br />removed while maintaining adequate safety measures. <br />2. Streets must be graded/leveled to provide reasonable assurance against <br />personal injury, vehicle damage, etc. <br />3. Streets temporarily restored, as described above, must be regularly <br />maintained. For example, streets must be watered, new potholes filled and <br />disturbed and adjacent paved streets swept. <br />F. The Contractor shall employ and pay for the services of an independent testing <br />laboratory to perform quality control services on work performed by the contractor. <br />G. There is an available Geotechnical Investigation Report at the City of Sunny Isle <br />Beach. <br />1. The above referenced report is no guarantee as to accuracy of completeness. <br />2. The Contractor is cautioned that this report has been utilized for general <br />purposes only and may be inadequate for the purposes of bidding on the <br />Contract items. <br />3. The availability of this report does not relieve the Contractor from his <br />responsibility to familiarize itself with the subsurface conditions that may affect <br />cost, progress and performance of work. <br />1.04 WORK PERFORMED BY OTHERS: <br />A. The City of Sunny Isles Beach or other contractors may perform work on the existing <br />water distribution system or public utilities as part of their maintenance and <br />operations. The Contractor shall conduct its operations so as to cause a minimum of <br />interference with the work of such other contractors and/or public utilities, and shall <br />cooperate fully to provide continuous safe access to their respective portions of the <br />site to perform their respective contracts. <br />1.05 CONTRACTOR'S USE OF PREMISES: See General Condition. <br />1.06 WORK SEQUENCE, COORDINATION ACTIVITIES AND SCHEDULED DATES: <br />A. General: Work under this contract shall be scheduled and performed in such a <br />manner as to result in the least possible disruption to driveway access. The <br />CONTRACTOR will coordinate its work with other adjacent contractors, landowners, <br />residents and City activities, with specific attention to access and staging areas. <br />Construction sequence shall be determined by CONTRACTOR subject to the <br />following needs for continuous access and operation by others. <br />1. The work will be performed in residential/commercial neighborhoods. The <br />CONTRACTOR shall reasonable minimize the inconvenience to the residents <br />and property owners, and reasonably maximize the safety of the residents: <br />2. construction activities shall take place in the evening in accordance with lane <br />closure hours approved by the FDOT for the project MOT. All open trenches <br />and excavations shall be closed or covered, and be in good driving condition <br />with permanent asphalt, at the end of each work day. CONTRACTOR cannot <br />proceed with the construction in more than one street at the same time, unless <br />approved otherwise. <br />3. The work shall be conducted to maintain access to existing driveways at all <br />times. <br />