My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 01010 Summary of Work
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 01010 Summary of Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:55:24 PM
Creation date
1/25/2016 4:55:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01010 - 3/3 <br />B. Construction Schedule: The CONTRACTOR shall submit a proposed construction <br />schedule, clearly showing the sequence of the work on a street-by-street and block <br />by block basis to the City and the ENGINEER for their approval. Refer to Section <br />01310 Construction Schedules. <br />1.07 COPIES OF DOCUMENTS: See General Conditions. <br />1.08 CONTRACT DOCUMENTS: <br />A. Contract Drawings: <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.