Laserfiche WebLink
<br />01020 - 10/15 <br /> <br />Measurement for payment shall be based upon the actual number of structures installed in <br />accordance with the contract documents. Payment shall be at the unit price bid per each. <br /> <br />Items 56 to 66 inclusive: <br />Supply and Install Conduit for Comcast / LF: The price for these items shall include but <br />not limited to all labor, equipment and materials necessary to install and construct <br />conduits, fittings with identification tape, blown –thru pull string, end caps in accordance <br />with these contract documents which include all saw cutting, asphalt and other excavated <br />materials removal and disposal, sheeting, shoring, bracing demucking, de-watering, any <br />measures associated with dewatering such as turbidity barrier and sediment control de- <br />watering permits, abandonment, removal or relocation of existing utilities, bedding <br />material, trench backfill or additional suitable backfill material, backfill base material, <br />compacted backfill limerock base material at least 16” thick or as shown on the road <br />restoration details, compaction, material to be restored to same elevation as existing <br />asphalt pavement grading, minimum of 1-1/2” ,or as shown on the road restoration details, <br />of type SP-9.5 Asphalt Fine Mix installed per FDOT standard specification, first lift to be <br />installed upon restoration of road base material ,sod replacement, regarding of existing <br />road surfaces, mixing and regarding of existing base material, Soft digs, test pits, <br />exploratory digging and restoration for existing utilities, repairs to damaged existing <br />utilities, repairs to irrigation systems, landscape, driveway ,curb and sidewalk restoration <br />,striping and pavement markings, signalization repair and all other consumables, <br />appurtenances and incidentals as shown on the plans and specifications and/or necessary <br />for a complete installation shall be included in the unit price for this pay item. No additional <br />compensation shall be made for changes in alignment or grade to avoid existing <br />infrastructure unless the excavation exceed ten(10) feet in depth. <br /> <br />Measurement for payment shall be based on the linear feet of conduit installed measured <br />as LF along the horizontal center line of the conduit installed .Payment for installation <br />shall be based at the unit price bid per linear foot of conduit. <br /> <br />Item 67: <br />Supply and install 24”x 36”x 48”hand hole for Comcast / EA: The price for these items <br />shall include but not limited to all labor, equipment and materials necessary to install and <br />construct the structure in accordance with these contract documents which include but not <br />limited to locating, verifying and protecting existing utilities, excavation , removal and <br />disposal of unsuitable material below the structure, graded stone bedding below structure, <br />de-watering, abandonment, removal or relocation of existing utilities, backfill or additional <br />suitable backfill material , and complete restoration sod replacement, regarding of existing <br />surfaces, Soft digs, test pits, exploratory digging and restoration for existing utilities, <br />repairs to damaged existing utilities, repairs to irrigation systems, landscape, driveway <br />,curb and sidewalk restoration , signalization repair and all other consumables, <br />appurtenances and incidentals as shown on the plans and specifications and/or necessary <br />for a complete installation shall be included in the unit price for this pay item. <br /> <br />Measurement for payment shall be based upon the actual number of structures installed in <br />accordance with the contract documents. Payment shall be at the unit price bid per each. <br />