My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 01020 Measurement and Payment-F3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 01020 Measurement and Payment-F3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:55:44 PM
Creation date
1/25/2016 4:55:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01020 - 11/15 <br /> <br /> <br />Items 68 to 70 inclusive: <br />Supply and Install Conduit for Hotwire / LF: The price for these items shall include but <br />not limited to all labor, equipment and materials necessary to install and construct <br />conduits, fittings with identification tape, blown –thru pull string, end caps in accordance <br />with these contract documents which include all saw cutting, asphalt and other excavated <br />materials removal and disposal, sheeting, shoring, bracing demucking, de-watering, any <br />measures associated with dewatering such as turbidity barrier and sediment control de- <br />watering permits, abandonment, removal or relocation of existing utilities, bedding <br />material, trench backfill or additional suitable backfill material, backfill base material, <br />compacted backfill limerock base material at least 16” thick or as shown on the road <br />restoration details, compaction, material to be restored to same elevation as existing <br />asphalt pavement grading, minimum of 1-1/2” ,or as shown on the road restoration details, <br />of type SP-9.5 Asphalt Fine Mix installed per FDOT standard specification, first lift to be <br />installed upon restoration of road base material ,sod replacement, regarding of existing <br />road surfaces, mixing and regarding of existing base material, Soft digs, test pits, <br />exploratory digging and restoration for existing utilities, repairs to damaged existing <br />utilities, repairs to irrigation systems, landscape, driveway ,curb and sidewalk restoration <br />,striping and pavement markings, signalization repair and all other consumables, <br />appurtenances and incidentals as shown on the plans and specifications and/or necessary <br />for a complete installation shall be included in the unit price for this pay item. No additional <br />compensation shall be made for changes in alignment or grade to avoid existing <br />infrastructure unless the excavation exceed ten(10) feet in depth. <br /> <br />Measurement for payment shall be based on the linear feet of conduit installed measured <br />as LF along the horizontal center line of the conduit installed .Payment for installation <br />shall be based at the unit price bid per linear foot of conduit. <br /> <br />Items 71: <br />Supply and Install directional bored conduit for Hotwire / LF: The price for <br />these items shall include but not limited to all labor, equipment , materials, and <br />incidentals required to perform the successful installation of the pipeline using <br />horizontal directional drilling The unit price for this item shall include but not limited <br />to the cost of permit ,exploratory methods (soft digs) to locate all existing utilities <br />that will be crossed by the horizontal directional drilling operation prior to preparing <br />the submittal of the operation for approval, drilling plan including description of the <br />sequence of events that will be performed to install the specified conduit using horizontal <br />directional drilling. The plan shall indicate the location of existing utilities as found by <br />exploratory methods in the field as well as the construction profile to be used by the <br />contractor to install the conduit. the unit price shall also include repair to damaged utilities <br />by the contractor and restoration for any damage caused by heaving, settlement, and/or <br />separation of pavement, <br />6. <br />