Laserfiche WebLink
<br />01020 - 15/15 <br /> <br />made for changes in alignment or grade to avoid existing infrastructure unless the <br />excavation exceed ten(10) feet in depth. <br /> <br />Measurement for payment shall be based on the linear feet of conduit installed measured <br />as LF along the horizontal center line of the conduit installed <br /> <br />Items 92: <br /> <br />Supply and install 24”x 13”x 12” pull box for City conduit / EA: The price for these <br />items shall include but not limited to all labor, equipment and materials necessary to install <br />and construct the structure in accordance with these contract documents which include <br />but not limited to locating, verifying and protecting existing utilities, excavation , removal <br />and disposal of unsuitable material below the structure, graded stone bedding below <br />structure, de-watering, abandonment, removal or relocation of existing utilities, backfill or <br />additional suitable backfill material , and complete restoration sod replacement, regarding <br />of existing surfaces, Soft digs, test pits, exploratory digging and restoration for existing <br />utilities, repairs to damaged existing utilities, repairs to irrigation systems, landscape, <br />driveway ,curb and sidewalk restoration , signalization repair and all other consumables, <br />appurtenances and incidentals as shown on the plans and specifications and/or necessary <br />for a complete installation shall be included in the unit price for this pay item. <br /> <br />Measurement for payment shall be based upon the actual number of structures installed in <br />accordance with the contract documents. Payment shall be at the unit price bid per each. <br /> <br />Items 93: <br />Flowable Fill / This item shall cover the costs for all labor, materials, equipment needed to <br />place flowable fill meeting specification in section 03375 <br /> <br />Measurement for payment shall be based on cubic feet of flowable fill delivered and <br />poured in place <br /> <br />Items 94: <br />Contingency allowance for conduit and boxes installation off Collins : The <br />contingency allowance provided in the bid form is for work to be performed off Collins <br />which is part of this contract. The work shall include but not limited to all labor, equipment <br />and materials necessary to install and construct conduit, fittings boxes and structures in <br />accordance with these contract documents. The construction plans for this work is <br />forthcoming. Payment shall be based on the unit prices submitted