<br />01020 - 7/15
<br />
<br />
<br />
<br />Items 31 :
<br />Install 24”hand hole (FPL to furnish hand hole) / EA: The price for these items shall
<br />include but not limited to all labor, equipment and materials necessary to install and
<br />construct the structure in accordance with these contract documents which include but not
<br />limited to locating, verifying and protecting existing utilities, excavation , removal and
<br />disposal of unsuitable material below the structure, graded stone bedding below structure,
<br />de-watering, abandonment, removal or relocation of existing utilities, backfill or additional
<br />suitable backfill material , and complete restoration,sod replacement, regarding of existing
<br />surfaces, Soft digs, test pits, exploratory digging and restoration for existing utilities,
<br />repairs to damaged existing utilities, repairs to irrigation systems, landscape, driveway
<br />,curb and sidewalk restoration , signalization repair and all other consumables,
<br />appurtenances and incidentals as shown on the plans and specifications and/or necessary
<br />for a complete installation shall be included in the unit price for this pay item.
<br />
<br />Measurement for payment shall be based upon the actual number of structures installed in
<br />accordance with the contract documents. Payment shall be at the unit price bid per each.
<br />
<br />Items 32 :
<br />Install 12’ x 8’ manhole (FPL to furnish manhole) / EA: The price for these items shall
<br />include but not limited to all labor, equipment and materials necessary to install and
<br />construct the structure in accordance with these contract documents which include but not
<br />limited to locating, verifying and protecting existing utilities, excavation , removal and
<br />disposal of unsuitable material below the structure, graded stone bedding below structure,
<br />de-watering, abandonment, removal or relocation of existing utilities, backfill or additional
<br />suitable backfill material , and complete restoration,sod replacement, regarding of existing
<br />surfaces, Soft digs, test pits, exploratory digging and restoration for existing utilities,
<br />repairs to damaged existing utilities, repairs to irrigation systems, landscape, driveway
<br />,curb and sidewalk restoration , signalization repair and all other consumables,
<br />appurtenances and incidentals as shown on the plans and specifications and/or necessary
<br />for a complete installation shall be included in the unit price for this pay item.
<br />
<br />Measurement for payment shall be based upon the actual number of structures installed in
<br />accordance with the contract documents. Payment shall be at the unit price bid per each.
<br />
<br />Items 33 :
<br />Install concrete pad for transformers and misc equipment (FPL to furnish concrete
<br />pad) / EA: The price for these items shall include but not limited to all labor, equipment
<br />and materials necessary to install and construct the structure in accordance with these
<br />contract documents which include but not limited to locating, verifying and protecting
<br />existing utilities, excavation , removal and disposal of unsuitable material below the
<br />structure, graded stone bedding below structure, de-watering, abandonment, removal or
<br />relocation of existing utilities, backfill or additional suitable backfill material , and complete
<br />restoration, sod replacement, regarding of existing surfaces, Soft digs, test pits,
<br />exploratory digging and restoration for existing utilities, repairs to damaged existing
<br />utilities, repairs to irrigation systems, landscape, driveway ,curb and sidewalk restoration ,
|