My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 01560 Environmental Controls
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 01560 Environmental Controls
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:56:52 PM
Creation date
1/25/2016 4:56:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01560 - 4/4 <br />D. The geotextile material used for the siltation fence shall consist of a woven or non- <br />woven fabric made from polypropylene. The fabric shall be non-rotting, acid and <br />alkali resistant, and inert to organic chemicals commonly encountered in soils. <br />1.8 DUST CONTROL <br /> <br />A. CONTRACTOR shall provide methods to control dust generated by construction <br />activities as directed by the ENGINEER. <br />B. An approved method of stabilization consisting of sprinkling or other similar <br />methods will be permitted to control dust. The use of petroleum products is <br />prohibited. The use of chlorides may be permitted with approval from the <br />ENGINEER. <br />C. Sprinkling, to be approved, must be repeated at such intervals as to keep all parts <br />of the disturbed area at least damp at all times, and the CONTRACTOR must <br />have sufficient competent equipment on the job to accomplish this if sprinkling is <br />used. Dust control shall be performed as the work proceeds and whenever a dust <br />nuisance or hazard occurs, as determined by the ENGINEER. <br /> <br />PART 2 - PRODUCTS (NOT USED) <br />PART 3 - EXECUTION (NOT USED) <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.