Laserfiche WebLink
<br />02050 - 3/3 <br />3.03 CONNECTIONS TO EXISTING CONSTRUCTION: <br />A. The CONTRACTOR shall cut and remove portions of existing construction as <br />required to allow proper installation of new construction. <br />B. The CONTRACTOR shall shore, brace and maintain existing structure(s) in a safe <br />condition until permanent supports are completed. <br />C. The CONTRACTOR shall repair all damage as a result of installation of shoring and <br />bracing. <br />3.04 CLEANUP AND REPAIR: <br />A. Upon completion of demolition work, the CONTRACTOR shall remove tools, <br />equipment and demolished materials from site; see SECTION 1.0 and 3.02 A and B <br />of this specification. <br />B. The CONTRACTOR shall repair demolition performed in excess of that required and <br />return structures and surfaces to conditions existing prior to commencement of <br />demolition work. The CONTRACTOR shall repair adjacent construction or surfaces <br />soiled or damaged by demolition work. <br />C. The CONTRACTOR shall remove or modify as indicated all existing construction <br />within the construction limits to the extent necessary to permit construction of the <br />work. The CONTRACTOR shall properly dispose of the material at an approved site <br />according to the State, Federal, and local regulations. <br /> <br />END OF SECTION <br />