Laserfiche WebLink
S-N.`-NCITY OF SUNNY ISLES BEACH + g <br /> " CONTINUING PROFESSIONAL AR®TEECIURAL&ENGINEERING sennas FIRMS ONLY(Calc► <br /> ® REQUEST FOR QIU(LIFIFATIONS NO.12-04-02 <br /> • Final design plans, specifications and opinion of probable costs <br /> • Bidding assistance . <br /> • Post design services • "Q•d <br /> • Construction management services r2 - ,' z• ` <br /> Currently, we are a working on a general engineering services contract for the �_ ,, <br /> Broward County Water and Wastewater Services Department and we .i . -,,-,<:: k ..- - <br /> participated in the Waterworks program for the City of Fort Lauderdale. In x.7--, "t ' } }� >` .n <br /> these contracts RJ Behar has performed design of water distribution systems, = „ ' d`=`= -,j, <br /> conversion of septic tank neighborhoods to wastewater collection systems, new als;; ::; t : ': , „ <br /> pump station design, rehabilitation of existing lift stations, electrical and f!� i 1S : : i <br /> mechanical evaluations, preparation of Basis of Design Reports (BODR), t.� . .L.- tc ` k ' :" <br /> review of master planning documents, evaluation of sites for communication ,� ` 1 nr• ' <br /> towers, hydraulic analyses and calculations, as well as construction - I; .,•� 7 r <br /> administration and observation services. ,`=1 <br /> NimuSglis t �, . r- t More specific to force <br /> \ ), Tan.,„-`''.. ti g, . ' main design, for the Broward County Water and <br /> V•3rt rr`jp . Wastewater Services Division, we recently <br /> ;e' �s� u 4 completed designing the rehabilitation of two <br /> �� y , <br /> .:�' �, �•`���- �f- sanitary pump stations as part of the UAZ Zone <br /> � � ,_ 303 utility improvements project and for Palm <br /> ® <br /> ",--,1.-- t• •-_,_;-, `,•J; :,-- •-, Beach County the relocation of a 16-inch force <br /> "J"1 r �' '.c main onto a new bride RJ Behar performed the <br /> o Vii, ti 9 <br /> s c.,a. ; <br /> - i*� � : complete design including the structural <br /> J_' , + % components. <br /> .4,: c. <br /> Stormwater projects may include: <br /> • Water quality analyses <br /> • Stormwater Master Planning <br /> • Permitting <br /> • NPDES Permitting and compliance <br /> • Public Involvement and Education <br /> • Hydrologic/Hydraulic Analyses <br /> • Evaluations of existing systems and developing recommendations for repairs and upgrades <br /> • Low Impact Design (LID) sustainable designs <br /> RJ Behar is currently a consultant to the Central Broward Water Control District. Under this contract, RJ <br /> Behar serves as one of two firms who serve as District Drainage Engineers (DDE). As DDE, RJ Behar <br /> reviews plats, applications for water management work permits, paving and drainage plans, as-built plans, <br /> ® <br /> and permit renewal applications for conformance with the District's drainage regulations, standards, <br /> ®i0 R.J.Behar SECTION 4 - PAGE 19 <br />