My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2016 4:20:03 PM
Creation date
2/1/2016 4:14:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Xr CITY OFSUNNY ISLES BEACH ::' <br /> CONTINUING PROFESSIONAL ARCHITECTURAL&FNOINEERING SERVICES FIRM!ONLY(TTNA) <br /> ® REQUEST FOR QUALIFICAMONB NO.12-04-02 <br /> CLIENT <br /> Palm Beach County NORTHLAKE BOULEVARD BRIDGE OVER THE <br /> Department of Engineering LOXAHATCHEE SLOUGH <br /> & Public Works Division of PALM BEACH COUNTY,FLORIDA <br /> Roadway Production <br /> 2300 North Jog Road RJ Behar developed the design for a new Northlake Bridge crossing over a <br /> West Palm Beach, Florida 33411 proposed canoe and wildlife crossing, connecting the City's southern and <br /> Mr. Dave Young, PE northern Water Catchment Areas. This innovative project is being jointly funded <br /> by The City of West Palm Beach, Palm Beach County (Environmental Resource <br /> Tel: (561) <br /> Tex: 684-4150 Management) and South Florida Water Management District. The innovative <br /> project is one important step in the process to rehydrate and biologically restore <br /> DLYOUNG(@,co.palm-beach.fl.us 10,000 acres of the historic Loxahatchee Slough, adjacent to the Grassy Waters <br /> Preserve in the City of West Palm Beach Water Catchment Area. <br /> RJ BEHAR'S ROLE The project will help satisfy four important environmental goals: <br /> Bridge design, drainage design, road- <br /> . Replenish water supply to the Loxahatchee Slough; <br /> way improvements and permitting • Provide additional flood control; <br /> • Provide a vital wildlife crossing of Northlake Boulevard; and <br /> • Provide a canoe trail(for recreational use). <br /> PROJECT STARTED: 10/2005 As part of the project, RJ Behar designed the relocation of 1,310 feet of 20 inch <br /> PROJECT COMPLETED: On-going water main and 1,299 feet of 16 inch force main. The new water main and force <br /> COST/FEES PAID: $116,378 main will be relocated on the new bridge. RJ Behar prepared all the details and <br /> ® CoNST.Co5T:S2,200,000 structural design to accommodate the new utilities on the bridge. <br /> (Estimated) <br /> RJ Behar also coordinated the plans with the City of West Palm Beach and <br /> obtained the Health Department permit. <br /> RJ BEHAR'S KEY PERSONNEL <br /> Robert J. Behar, PE <br /> Principal in Charge <br /> Sean F. O'Keefe, PE (Iaiyr , <br /> Project Manager cop.' <br /> Juan H. Vazquez, PE, PH, BCEE 4.;, , ; �r .� , s . 1:4'4,,,,' r <br /> I)e P.��F t2ti `tai 'c121�' :.r ! ar .rc•w �?'1' � <br /> Drainage Engineer . �� ..d_,--•�. «i <br /> Jerry Piccolo, PE r � <br /> Structural Engineer -'4•• , J <br /> Nannette Akyaz �V- <br /> Roadway Designer J - i/t Re i)r' ,h I t 1 <br /> I:. ri <br /> +' r V Al 4� jt i <br /> Jasmani Riveron r is �.;,2 ,.t- 'A/:E r <br /> Project Engineer y :" � _ H <br /> _ -: - - � 1 <br /> 0 <br /> ®�� R.J.Behar SECTION 2 - PAGE 1 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.