My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2016 4:20:03 PM
Creation date
2/1/2016 4:14:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zr-rN <br /> - CITY OF SUNNY ISLES BEACH ' <br /> . , ____ n_2.....1%:-:-,,7:-.NPITE .. <br /> .7 ,ri fl CORNING PROFESSIONAL ARCHITECTURAL&acuFEenN6 SEMMES FIRMS ONLY(COW . <br /> ® REQUEST FOR QOAIIFIFATIONS NO.12-04-02 <br /> CLIENT <br /> City of Hialeah Street Division <br /> 5601 E 8th Avenue W.53rd STREET (FROM W. 12TH AVENUE TO W. 16TH <br /> Hialeah, Fl 33013 AVENUE) CEI - AMERICAN RECOVERY <br /> Mr. Jose Sanchez & REINVESTMENT ACT <br /> Streets Engineer CITY OF HIALEAH,FLORIDA <br /> Tel: (305) 687-2611 <br /> Fax: (305)687-2632 The scope of this Design-Build project consists of street reconstruction of West <br /> JOSanchezhialeahfl.qov 53b Street from West 12th Avenue to West 16th Avenue, including new sidewalk, <br /> curb and gutter, drainage improvements - new drainage inlets, 18" storm sewer <br /> cross drainage pipe, 18" exfiltration trench (French Drain). The project scope <br /> RJ BEHAR'S ROLE also included pavement milling and resurfacing, signing and pavement markings, <br /> Construction Engineering Inspection and grading of the adjacent swale areas with sod restoration with Performance <br /> Services Turf. <br /> This project is being proposed as a Design-Build, and is federally funded by the <br /> PROJECT STARTED: 09/30/2011 American Recovery & Reinvestment Act. RJ Behar was assigned by the City of <br /> PROJECT COMPLETED: Ongoing Hialeah to ensure strict compliance with all Federal ARRA Regulations; making <br /> CEI COST: $126,263.09 all the necessary construction engineering inspections, performing sampling and <br /> DESIGN-BUILD COST: $781,000 testing of the material fumished, and overseeing the work performed by the <br /> contractors. ,^ >- . re. ' `' •��+.'` <br /> CONTRACTOR: Williams Paving • `,Tn tt, _ i !i-TA..`f .. ;b .- <br /> 41) RJ BEHAR'S KEY PERSONNEL r4 '7-21.-." • - ,r' <br /> Robert J. Behar, PE <br /> III '"'�— -!--t;-'-' <br /> o - <br /> Principal in Charge - ." ,ff ` ` b t; •• a ^i <br /> David G. Romano, PE . ' ' _ -_�:.' <br /> Project Manager/ + ill, - 1 - o <br /> Senior Project Engineer 4c °� y'= <br /> Rafael Urdaneta, CCM x �';R/K%" °^ }y � �•'• <br /> !.v ',i Y j .„,,e17411:1'. ., <br /> , �. - - t ;,14 x .-r 4r. -k. <br /> Project Administrator r o s+i2.._ z F <br /> Stacy Sookdew-Sing �i , o' Nr . jjjj <br /> Sioeent Compliance r0 •Specialist •a•e. ' °rte - , _ . . <br /> Rosalie Kardan �--��n f o . <br /> Resident Compliance Specialist ' " t. I;- `e ) t,rr ^ J <br /> Michael Owensby �- -� ._ s •_ <br /> Senior Roadway Inspector e t; <br /> t_ ° o ,l: <br /> Mauricio Pinzon '4 �_ ° •- <br /> Roadway Inspector "� `x - oa` 'i . ` <br /> • <br /> ,, -. sem. �� _ ; <br /> G . . C ,i <br /> ® <br /> rs <br /> � FD <br /> rr•�• -.Y�, .�y�t ,��-�`Aa Tyr,e• <br /> ® R.J.Be ha r —_.__..` �_---�— " -- ._'.` . -`�,-r-;>.�,:" <br /> SECTION 2 • PAGE 125 <br /> III_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.