Laserfiche WebLink
CITY OF SUNNY ISLES BEACH <br /> EONruTIN6 PROFESSIONAL AH®ITEC URAL&MOURN SERVICES►etre ONLY(COW <br /> WEST FOR 00n>fffumONS NIL 12.04-02 <br /> ® JUAN H. VAZQUEZ, PE, PH, BCEE <br /> VICE PRESIDENT/PROJECT MANAGER <br /> ENGINEERING EXPERIENCE <br /> Mr. Vazquez has more than 26 years of civil engineering experience including: <br /> 1'f` preparation of stormwater master plans, drainage studies, and street improvements. <br /> He has designed highways, interchanges, intersections,(both urban and rural), <br /> prepared pavement designs, transportation studies, hydrologic- hydraulic (H-H) and <br /> scour studies, utility relocations, etc. He recently managed a general engineering <br /> service contract for the South Florida Water Management District. Mr. Vazquez is a <br /> Professional Hydrologist (PH) and a Board Certified Environmental Engineer (BCEE) <br /> specializing in water supply and waste water. For the fourth year in a row, Mr. <br /> EDUCATION Vazquez is in the "Who's Who book of Environmental Engineering, 2010". He is <br /> B. S. Civil Engineering. University of currently the president of the Association of Engineers and Land Surveyors of Puerto <br /> Puerto Rico, 1985 Rico, Florida Chapter. <br /> PROFESSIONAL RELEVANT EXPERIENCE <br /> REGISTRATIONS Seaboard Marine Cargo Terminal Redevelopment Phase III, Port of Miami, <br /> • P.E. Florida License Florida <br /> No.51143/1996 Principal in Charge. He provided quality control and project management services for <br /> .Virginia License drainage design of the Seaboard terminal at the Port of Miami redevelopment. He is <br /> P.E <br /> P.E 0402 0a5Licens4 also the Engineer of Record for modifications and injection well permitting. <br /> No.P.E. Puerto Rico License Structure Inspection Program (SIP) Non-Sta Structures — South Florida Water <br /> No.11385/1989 Management District(SFWMD) <br /> ® P.E. Michigan License Project Manager. He was in charge of the civil, electrical, mechanical and structural <br /> No.4648211999 engineering inspection services for: 31 culverts, 13 pump stations, 13 spillways, and 2 <br /> Professional Hydrologist weirs. The extent of this project also included a Phase 2 inspection, and report of the S <br /> - cense No.Hydrol gist2006 65D Boat Lock. RJ Behar also coordinated a corrosion evaluation and a lead base <br /> Li <br /> - Board Certified Environmental paint evaluation. <br /> Engineer 07-20009/2007 North County Neighborhood Improvement Project—Broward County, Florida <br /> Engineer of Record for the drainage design. He supervised, managed and provided <br /> PROFESSIONAL SOCIETIES quality control reviews for the drainage design of Broward County's North County <br /> • American Society of Civil Neighborhood Improvement Project. <br /> Engineers District Engineers Permit Reviews — Central Broward Water Control District <br /> Association of Engineers and Land (CBWCD) <br /> Surveyors. Puerto Rico Technical Expert. He provided hydrologic-hydraulic expertise and reviewed technical <br /> • Americaner Society of Highway issues regarding projects. He provided hydraulic design of a large culvert canal <br /> Engineers crossing. <br /> American Public Works Design/Build for 1-595 Final Design, Broward County, Florida — FDOT, District 4 <br /> (AECOM/Dragados) <br /> Association <br /> American Institute of Hydrology Task Manager responsible for the overall drainage master plan update and complete <br /> Florida Institute of Consulting drainage design for the entire corridor, which includes exfiltration trenches, storm <br /> • Water Resources sewer design and analysis, cross drain analysis, and both wet and dry retention, and <br /> Engineers, <br /> CommitteeMcate stormwater management designs for seven out of eight design zones. He was <br /> er <br /> American Academy of engineer of record for two of the eight segments. He also prepared the stormwater <br /> Environmental Engineers master plan for the wining proposal. Project length: 10.5 miles± <br /> C 4 Canal Flood Protection Belen Section — South Florida Water Management <br /> YEARS OF EXPERIENCE District(SFWMD) <br /> 26 Years Project Manager. He was in charge of the design of a flood wall, and new drainage <br /> ® outfalls in the area of Belen, Miami-Dade County. <br /> YEARS WITH RJ BEHAR <br /> 2000—Present <br /> ®jo R.J.Behar SECTION 3 - PAGE 14 <br />