CARLOS MAZORRA, PE
<br /> SR-838(Sunrise Boulevard)NW 27th Avenue, Broward County, Florida— FDOT, District 4
<br /> Project Manager in charge of the design and production of roadway, signing and pavement marking, and signalization
<br /> 41 plans. The scope of this safety improvement project is to mill and resurface NW 27th Avenue, as well as improve the
<br /> existing signalization system.
<br /> SR-838(Sunrise Boulevard) NW 31s,Avenue Broward County, Florida— FDOT, District 4
<br /> Project Manager in charge of the design and production of roadway, signing and pavement marking, and signalization
<br /> plans.The scope of this safety improvement project is the addition of two left turn lanes, milling and resurfacing, and
<br /> pavement widening and the addition of two new signal mast arms.
<br /> SR-5(US-1/South Federal Highway) Deerfield Beach, Florida— FDOT, District 4(FM No. 403575-3-52-01)
<br /> Project Manager — He was responsible for the milling and resurfacing (RRR) of a major arterial; including safety
<br /> improvements.
<br /> SR- 5/US-1 Resurfacing (Boca Raton, Florida)—FDOT, District 4(FM No. 415310-1-52-01)
<br /> Project Manager — He was responsible for the milling and resurfacing (RRR) project of 1.4 miles of a major collector.
<br /> Upgraded pavement markings were included.
<br /> SR-806(Atlantic Avenue) Palm Beach County, Florida—FDOT, District 4(FM No. 413841-1-32-01)
<br /> Project Manager for the roadway improvements. The scope included milling and resurfacing (RRR) of 2.8 miles of a major
<br /> arterial roadway, including drainage improvements, pavement marking and signing, lighting plans, eight signal locations, a
<br /> public involvement program and landscape improvements.
<br /> Powerline Road (SR-845) Palm Beach County, Florida — FDOT, District 4 (FM No. 229812-1-32-01; 229812-1-62-02;
<br /> 229812-3-32-01)
<br /> Project Engineer for signal design. The project included milling and resurfacing 3 miles of a major collector, 8 signal
<br /> upgrades, safety improvements and miscellaneous drainage improvements.
<br /> NW 87th Avenue(SR-973/Galloway Road)Miami-Dade County, Florida—FDOT, District 6 (FM No.405615-3-52-01)
<br /> Project Engineer in charge of the signalization plans for the new construction and reconstruction of NW 87th Avenue from
<br /> NW 74th Street to NW 103rd Street in Medley, Florida. The scope of this project included roadway plans, drainage, traffic,
<br /> lighting, signing and marking, signalization and bridge plans. Project length: 1.90 miles.
<br /> PLANS REVIEW
<br /> SR-AIA Plans Review— FDOT, District 4
<br /> He performed complete plans review for a roadway design project.
<br /> US-1 Plans Review—FDOT, District 4
<br /> Mr. Mazorra performed complete plans review for a roadway design project.
<br /> Sheridan Street Plans Review— Broward County Highway Engineering
<br /> He performed complete plans review for a roadway design project.
<br /> FEMA PROJECTS
<br /> Mr. Mazorra is a former FDOT employee, after Hurricane Andrew he performed traffic control duties at several intersections
<br /> in Miami-Dade County. These projects included:
<br /> Crandon Boulevard, Key Biscayne, Florida— FDOT, District 6
<br /> The scope consisted of the rehabilitation and replacement of missing street lights.
<br /> City of Homestead Business, Homestead Florida—FDOT, District 6
<br /> The scope consisted of the rehabilitation and replacement of landscaping material.
<br /> City of Coral Gables, Florida—FDOT, District 6
<br /> The scope consisted of the rehabilitation and replacement of landscape material project.
<br /> Miami-Dade County, Florida— FDOT, District 6
<br /> The scope consisted of the rehabilitation and replacement of landscaping material.
<br /> EXPERT WITNESS
<br /> Eminent Domain Expert Witness— FDOT, District 4
<br /> The scope of the project was to provide engineering services including review and analysis of construction plans, right-of-
<br /> way maps, cures and other engineering issues including traffic flow analysis, design access analysis and any related
<br /> 40 engineering service requested, to prepare exhibits and testify at deposition and trial.
<br /> fl D R.J.Behar
<br /> COSECTION 3 • PAGE 24
<br /> PBIIFEMONAI Atm&ENMEIIN6 URAICH RIM MY(MA)
<br /> 1E0=FOR OWI1GE1ONI NO.12-04-02