Laserfiche WebLink
CITY OF SUNNY ISLES BEACH <br /> P <br /> CORLL9 NG PROFESSIONAL ARCIIRE URAL&FNOQHBRl6 SERVICES Hum ONLY(CIXA) <br /> REQUEST FOR Qea1>HrumON3 NO.12-04-02 <br /> ® CARLOSMAZORRA, PE <br /> STREET HIGHWAY DESIGNERISIGNALIZATION <br /> -;:-:.7.::::.: <br /> ENGINEERING EXPERIENCE <br /> �5. <br /> Mr. Mazorra has been the Project Engineer/Manager for the preparation of numerous, <br /> very successful highway construction plans. This included design of horizontal and <br /> _'9 vertical geometry with GEOPAK software. He has done drafting plans, profiles, cross <br /> -q',- sections, traffic controls and various ancillary roadway plan sheets using MicroStation <br /> - software. Mr. Mazorra has designed roadway signal plans in collaboration with traffic <br /> engineering and structural engineering personnel. He also has 11 years of experience <br /> S as an FDOT employee and knows the policies and needs of the FDOT from both a <br /> ♦ V�I u\�`'- ; 'L:r: technical and managerial perspective, and can thereby assure the success of any <br /> project. At RJ Behar, Mr. Mazorra is responsible for the design, project management <br /> EDUCATION and quality control for the Company's Highway Group. He has 25 years of <br /> B. S.Civil Engineering, experience. <br /> University of Miami. <br /> December1983 RELEVANT EXPERIENCE <br /> Design/Build for 1-595 Final Design- Broward County, Florida- FDOT, District 4 <br /> PROFESSIONAL (AECOM/Dragados) <br /> REGISTRATIONS Task Manager - He is in charge of the design and production of the signalization <br /> P. E. Florida License design of twelve intersections along SR-84 for the reconstruction of the 1-595 corridor. <br /> No.42653, 1990 Project length: 10.5 miles±. <br /> NW 44th Street-City of Lauderdale Lakes, Florida <br /> CONTINUING EDUCATION Project Manager- Construction of a new 4-lane median divided facility. The project <br /> ® 2005 Bentley MicroStation V8 includes roadway plans, drainage plans, privacy walls plans, permitting, utility <br /> User Update coordination and inspection services. <br /> Atlantic Boulevard/Rock Island Road Intersection Improvement - Broward <br /> County Engineering <br /> YEARS OF EXPERIENCE Project Manager- He prepared the traffic study, roadway plans, signalization plans, <br /> 25 Years signage plans, drainage plans and utility coordination for a major intersection <br /> improvement. Project length: 0.501 miles <br /> YEARS WITH RJ BEHAR Hillsboro Boulevard/Military Trail Intersection Improvement - Broward County <br /> 2002- Present Engineering <br /> Project Manager - He prepared the traffic study, roadway plans, signalization plans, <br /> signage plans, drainage plans and utility coordination for this major intersection <br /> improvement. <br /> Hollywood Boulevard/N. 28th Avenue Intersection Improvement - Broward <br /> County Engineering <br /> Project Manager- He prepared the traffic study, roadway plans, signalization plans, <br /> signage plans, drainage plans and utility coordination for this major intersection <br /> improvement. <br /> SR-820 (Pines/Hollywood Boulevard) From East of 64th Way to West of SR-7, <br /> Broward County, FL- FDOT, District 4 <br /> Project Manager-Responsible for the design and production of roadway, signing and <br /> pavement marking and signalization plans. The scope of work includes milling and <br /> resurfacing (RRR) of the existing pavement; upgrading roadway signs and curb <br /> ramps to meet current standards, upgrade pedestrian and signal features and <br /> Landscape improvements. Project length: 10 miles. <br /> II <br /> ®10 R.J.Behar SECTION 3 - PAGE 123 <br />