ANTHONY V. ALFRED, PE
<br /> SR-836 Auxiliary Lanes, Project Development and Environment (PD&E) Study, Miami-Dade County, Florida — MDX
<br /> (EAC Consulting, Inc.)
<br /> ® Project Engineer— The scope includes widening and construction of auxiliary lanes on SR-836 at NW 57th Avenue to the
<br /> Toll Plaza. RJ Behar provided the drainage analysis, typical section package, utility coordination and the design variation
<br /> package.
<br /> North Bayshore Drive Roadway Improvements—City of Miami, Florida
<br /> Project Engineer— The project consisted of roundabout construction along with milling and resurfacing. The scope of this
<br /> project included roadway plans, signing and marking plans and landscaping plans:RJ Behar introduced the design of a
<br /> roundabout(traffic circle)on the corner of North Bayshore Drive and NE 17th Terrace. Project length: 0.317 miles
<br /> Downtown Miami Storm Sewer Project(North Bayshore Drive)—City of Miami, Florida
<br /> Quality Control Engineer — The project consisted of a total reconstruction of the roadway and the design and
<br /> implementation of a drainage system, which included the replacement of the subsurface drainage system. As part of the
<br /> stormwater management system, drainage wells were utilized to assist in alleviating the flooding. The project required
<br /> drainage calculations for approval from Miami-Dade County Department of Environmental Management(DERM).
<br /> Hillsboro Boulevard/Military Trail Intersection Improvement—Broward County Engineering
<br /> Senior Engineer who prepared the roadway plans, signing and pavement marking plans, drainage plans and utility
<br /> coordination for this major intersection improvement project.
<br /> NW 711,19'"Avenue Connector(Design)—City of Fort Lauderdale, Florida
<br /> Project Engineer—The project includes the roadway design of a 1.5 mile urban section, 4-lane divided,connector between
<br /> NW 7th and NW 9th Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization, drainage
<br /> design, signing pavement marking and permitting as well as public involvement coordination. Project length: .5 mile
<br /> NW 44th Street Drainage Improvements—City of Sunrise, Florida
<br /> Project Engineer responsible for the design plans,construction documents and specifications for the construction of a swale
<br /> and sidewalk with tree wells. This included the typical section analysis, plans, cross sections, drainage structures, traffic
<br /> control plans and stormwater pollution prevention plans.A drainage analysis was also performed for the design of the outfall
<br /> structure,which connects to a local canal.
<br /> Bus Shelter- Design Build—City of Lauderdale Lakes, Florida
<br /> Project Engineer — Responsible for preparing the Design Build Criteria Package for the construction of five bus shelters
<br /> along State Road 7, between Oakland Park Boulevard and Commercial Boulevard. This involved the preparation of the
<br /> scope,contract requirements, specifications, etc.
<br /> North Miami Avenue between NE 169th Street& NE 170th Street—City of North Miami Beach, Florida
<br /> Engineer of Record for addition of cul-de-sacs, curb and gutter typical sections, parking areas and drainage improvements.
<br /> He also provided the utility coordination and the public involvement.
<br /> SR-71Sunrise Boulevard Lighting Design—City of Lauderhill, Florida
<br /> Project Engineer and Utility Manager for the lighting plans preparation. This project consisted of roadway lighting design for
<br /> SR-7 (US-441) at Sunrise Boulevard in the City of Lauderhill. The design was completed in accordance with the FDOT
<br /> Roadway Lighting Criteria. Due to numerous existing utilities, the light pole foundations included the design of spread-
<br /> footings as well as extensive coordination by Mr. Alfred, who functioned as the utility manager, with the utility owners. The
<br /> project also involved procuring a permit from FDOT. Project length: 1.5 miles
<br /> SW 328th Street (SR-9336) from SW 152^d Avenue to SW 137th Avenue, City of Homestead, Florida — Miami-Dade
<br /> County Public Works Department- Highway Division/Plans Review and Design
<br /> Project Manager— The scope of the project included master planning and feasibility analysis for the new roadway. This
<br /> project involved the upgrading of the existing traffic signals to mast-arms and internally illuminated signs. The design phase
<br /> for this project comprised of drainage, lighting,signalization, signing and pavement markings. Project length: 1.52 miles
<br /> East 56th Street, East 4th Avenue to East 8th Avenue—City of Hialeah, Florida
<br /> Project Engineer — He developed the horizontal and vertical geometric design, drainage, typical sections and earthwork
<br /> computations. He generated the quantities and prepared display boards for public involvement meetings. Mr. Alfred also
<br /> coordinated utility relocations with the utility agency owners(UAO).
<br /> Welleby Park Expansion—City of Sunrise, Florida
<br /> Project Engineer in charge of the coordination with the City of Sunrise for the location and design of the concrete pads for
<br /> the °Life Trail° ADA accessible wellness/exercise stations. He was also in charge of the regrading and drainage design
<br /> ® required,which solved the existing drainage problem within and around the Tot-Lot play area. He also coordinated with the
<br /> various manufacturers and supervised the production of the specifications package.