Laserfiche WebLink
ANTHONY V. ALFRED, PE <br /> SR-836 Auxiliary Lanes, Project Development and Environment (PD&E) Study, Miami-Dade County, Florida — MDX <br /> (EAC Consulting, Inc.) <br /> ® Project Engineer— The scope includes widening and construction of auxiliary lanes on SR-836 at NW 57th Avenue to the <br /> Toll Plaza. RJ Behar provided the drainage analysis, typical section package, utility coordination and the design variation <br /> package. <br /> North Bayshore Drive Roadway Improvements—City of Miami, Florida <br /> Project Engineer— The project consisted of roundabout construction along with milling and resurfacing. The scope of this <br /> project included roadway plans, signing and marking plans and landscaping plans:RJ Behar introduced the design of a <br /> roundabout(traffic circle)on the corner of North Bayshore Drive and NE 17th Terrace. Project length: 0.317 miles <br /> Downtown Miami Storm Sewer Project(North Bayshore Drive)—City of Miami, Florida <br /> Quality Control Engineer — The project consisted of a total reconstruction of the roadway and the design and <br /> implementation of a drainage system, which included the replacement of the subsurface drainage system. As part of the <br /> stormwater management system, drainage wells were utilized to assist in alleviating the flooding. The project required <br /> drainage calculations for approval from Miami-Dade County Department of Environmental Management(DERM). <br /> Hillsboro Boulevard/Military Trail Intersection Improvement—Broward County Engineering <br /> Senior Engineer who prepared the roadway plans, signing and pavement marking plans, drainage plans and utility <br /> coordination for this major intersection improvement project. <br /> NW 711,19'"Avenue Connector(Design)—City of Fort Lauderdale, Florida <br /> Project Engineer—The project includes the roadway design of a 1.5 mile urban section, 4-lane divided,connector between <br /> NW 7th and NW 9th Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization, drainage <br /> design, signing pavement marking and permitting as well as public involvement coordination. Project length: .5 mile <br /> NW 44th Street Drainage Improvements—City of Sunrise, Florida <br /> Project Engineer responsible for the design plans,construction documents and specifications for the construction of a swale <br /> and sidewalk with tree wells. This included the typical section analysis, plans, cross sections, drainage structures, traffic <br /> control plans and stormwater pollution prevention plans.A drainage analysis was also performed for the design of the outfall <br /> structure,which connects to a local canal. <br /> Bus Shelter- Design Build—City of Lauderdale Lakes, Florida <br /> Project Engineer — Responsible for preparing the Design Build Criteria Package for the construction of five bus shelters <br /> along State Road 7, between Oakland Park Boulevard and Commercial Boulevard. This involved the preparation of the <br /> scope,contract requirements, specifications, etc. <br /> North Miami Avenue between NE 169th Street& NE 170th Street—City of North Miami Beach, Florida <br /> Engineer of Record for addition of cul-de-sacs, curb and gutter typical sections, parking areas and drainage improvements. <br /> He also provided the utility coordination and the public involvement. <br /> SR-71Sunrise Boulevard Lighting Design—City of Lauderhill, Florida <br /> Project Engineer and Utility Manager for the lighting plans preparation. This project consisted of roadway lighting design for <br /> SR-7 (US-441) at Sunrise Boulevard in the City of Lauderhill. The design was completed in accordance with the FDOT <br /> Roadway Lighting Criteria. Due to numerous existing utilities, the light pole foundations included the design of spread- <br /> footings as well as extensive coordination by Mr. Alfred, who functioned as the utility manager, with the utility owners. The <br /> project also involved procuring a permit from FDOT. Project length: 1.5 miles <br /> SW 328th Street (SR-9336) from SW 152^d Avenue to SW 137th Avenue, City of Homestead, Florida — Miami-Dade <br /> County Public Works Department- Highway Division/Plans Review and Design <br /> Project Manager— The scope of the project included master planning and feasibility analysis for the new roadway. This <br /> project involved the upgrading of the existing traffic signals to mast-arms and internally illuminated signs. The design phase <br /> for this project comprised of drainage, lighting,signalization, signing and pavement markings. Project length: 1.52 miles <br /> East 56th Street, East 4th Avenue to East 8th Avenue—City of Hialeah, Florida <br /> Project Engineer — He developed the horizontal and vertical geometric design, drainage, typical sections and earthwork <br /> computations. He generated the quantities and prepared display boards for public involvement meetings. Mr. Alfred also <br /> coordinated utility relocations with the utility agency owners(UAO). <br /> Welleby Park Expansion—City of Sunrise, Florida <br /> Project Engineer in charge of the coordination with the City of Sunrise for the location and design of the concrete pads for <br /> the °Life Trail° ADA accessible wellness/exercise stations. He was also in charge of the regrading and drainage design <br /> ® required,which solved the existing drainage problem within and around the Tot-Lot play area. He also coordinated with the <br /> various manufacturers and supervised the production of the specifications package. <br /> fllI] R.J.Behar SECTION 3 - PAGE 122 <br /> COWIINThG PBOIUUOSAL AOIUIThCTUAI I Fx6L11E 1 UIVI1:13 MPH OAlY(CCM <br /> I I ItOWI Pot OUIUYUUONI NO.12-04-02 <br />