Laserfiche WebLink
PAOLA RIVEROS, El <br /> C-4 Canal Flood Protection Project, City of Sweetwater, Florida—South Florida Water Management District <br /> Project Engineer for drainage design along C-4 canal north bank and flood protection cut-off wall. <br /> Design/Build for 1-595 Final Design, Broward County, Florida—FDOT, District 4(AECOM IDragados) <br /> Project Engineer involved with drainage design for several sections of the corridor. Design tasks include exfiltration trench <br /> design, storm sewer design and analysis, and both wet and dry retention stormwater management pond designs. The <br /> design involved the use of spreadsheets, ICPR,ASAD and Microstation. Project length: 10.5 miles <br /> Powerline Road (SR•845) Palm Beach County, Florida—FDOT, District 4 <br /> Project Engineer in charge of the project design. The project included milling and resurfacing of 3 miles of a major collector, <br /> 8 signal upgrades, safety improvements and miscellaneous drainage improvements. <br /> SR-AIA Resurfacing Project, Palm Beach County, Florida—FDOT, District 4 <br /> Project Designer for RRR project, from the Boynton Inlet Bridge to SR-802 (Lake Worth). The project included milling and <br /> resurfacing for 4 miles and reconstruction of 1 mile of a major rural roadway, as well as drainage improvements, coastal <br /> drainage studies, pavement marking and signing, overhead signing plans, lighting plans, three signal locations, bridge <br /> plans, wetland mitigation, public involvement, design documentation and landscape plans. She performed the AdICPR <br /> drainage modeling of existing and proposed conditions. Project Length: 5 miles. <br /> Hollywood Boulevard (SR•820)from SR-AIA to US-1 — FDOT, District 4 <br /> Project Engineer for the preparation of drainage plans, including coordination with utilities. <br /> Southern Boulevard (SR•80) Drainage Design—FDOT, District 4 <br /> Project Engineer — She performed area calculations and input data into AdICPR stormwater model. She performed <br /> floodplain volume compensation calculations. <br /> US•1 (Federal Highway) Hallandale Beach, Florida— FDOT, District 4 <br /> Project Designer— This RRR project went from the County Line to Hallandale Beach Boulevard. This project included the <br /> design of a 0.8 mile,six-lane, urban,divided highway as well as minor drainage Improvements. <br /> Kings Highway(SR-713)Resurfacing— FDOT District 4 <br /> Project Engineer—She assisted in the preparation of the 3R report. She prepared the Summary of Crash Analysis. <br /> Andrews Avenue, Broward County, Florida—FDOT, District 4(Keith &Schnars, PA) <br /> Project Engineer—She prepared the pond siting report. <br /> 411 <br /> TRAFFIC ANALYSES <br /> Atlantic Boulevard at Rock Island Road, Intersection Improvement— Broward County Engineering <br /> Project Engineer— Performed a traffic analysis to determine existing Level of Service (LOS) and provide recommendations <br /> to improve the existing deficiencies. It also included projections for the design year. <br /> SW 172nd Avenue Traffic Calming—Town of Southwest Ranches, Florida <br /> Project Engineer who developed design altematives for traffic calming along NW 172^4 Avenue between Griffin Road and <br /> Sheridan Street. <br /> SW 199th Avenue Traffic Calming—Town of Southwest Ranches, Florida <br /> Project Engineer who developed design alternatives for closing of NW 199th Avenue. <br /> NW 8th Street& Hallandale Beach Boulevard—City of Hallandale Beach, Florida <br /> Project Engineer — She performed a traffic analysis to determine the existing Level of Service (LOS) and provided <br /> recommendations to improve the existing deficiencies. <br /> COST ESTIMATING <br /> Neighborhood Participation Program—City of Sunrise, Florida <br /> Project Engineer — She prepared cost estimates for eighteen neighborhood improvement projects. The project included <br /> performing field investigations to determine the project scope to estimate the quantities and cost for the improvements. <br /> Cost Estimates—City of Sunrise, Florida <br /> Project Engineer—Responsible for preparing cost estimates for Panther Parkway improvements,Village Elementary School <br /> improvements and Sawgrass Corporate. <br /> Various Communities—City of Sunrise, Florida <br /> Project Engineer — She prepared cost estimates for 18 communities as part of the Neighborhood Participation Program. <br /> The scope of the project included new entry signs, landscaping, lighting, sidewalks, pavers and general improvements. <br /> 1110 <br /> 181 R.J.Behar COMMSECTION 3 • PAGE 130 <br /> Iii P IRRsoe%u uomanaal&LYSAmIM <br /> RE m RIMS ONLY(cd u <br /> REMIT FOR unmunols No.1244-02 <br />