Laserfiche WebLink
CITY OF SUNNY ISLES BEACH <br /> CONTINEN6 PROFFMSIQNAL AROIITECTER,AL&QIGRELRING SERVICES FIRMS mar(CVA) <br /> RN=FOR QUAIJHCATIONS NO.124402 <br /> SUGEILY PATXOT <br /> WATER AND SEWER <br /> ENGINEERING EXPERIENCE <br /> flMs. Patxot has a number of years experience performing as a Project Engineer for a <br /> range of water resource projects. At RJ Behar, Ms. Patxot is responsible for plans <br /> preparation and the calculation of drainage designs. She has worked in preparation of <br /> drainage projects as well as designing construction plans for sanitary sewers. <br /> RELEVANT EXPERIENCE <br /> 1-595 Final Design, Broward County, Florida— FDOT, District 4(AECOM IDragados) <br /> Project Engineer — Involved with developing the drainage master plan update, and <br /> assisted with the drainage design for several sections of the corridor. Design tasks <br /> include extiltration trench design, storm sewer design and analysis, and both wet and dry <br /> retention, and sitormwater management pond designs. The design involved the use orf <br /> spreadsheets,ADICPR,ASAD and Microstation. <br /> EDUCATION Broadview Estates BP 2 Sanitary Sewer Collection — Broward County Water and <br /> B. S. Civil Engineer, Wastewater Department <br /> University of Puerto Rico 2007 Designer—She devised plans and profiles for a sanitary gravity collection system for a <br /> complete neighborhood collection structure. <br /> SKILLS Structure Inspection Program Non-Sta Structures — South Florida Water <br /> • Microstation V-8 Management District <br /> AutoCAD Project Engineer— She coordinated the preparation of deliverables with inspectors. She <br /> Microsoft Word followed up with QC comments as well as client comments. She planned and prepared <br /> • Excel tracking charts for all deliverables. She occupied numerous hours preparing inspection <br /> • PowerPoint reports in coordination with an inspection team. <br /> ® - ASAD SR•A1A Palm Beach County, Florida— FDOT, District 4 <br /> Project Engineer— The scope consisted of roadway improvements along SR AlA, from <br /> Boynton Inlet Bridge to Lake Worth Road. The project included a major drainage study <br /> YEARS OF EXPERIENCE and improvements, milling and resurfacing, signals, bridge improvements, signing and <br /> 4 Years marking plans. Ms. Patxot devised plan revisions during post design services. <br /> C-4 Canal Flood Protection Belen Section — South Florida Water Management <br /> YEARS WITH RJ BEHAR District <br /> 2007- Present Project Engineer in charge of AutoCAD plans preparation for designing a floodwall for <br /> flood protection intended for the area of Belen in Miami-Dade. <br /> North County Neighborhood Improvement Project— Broward County, Florida <br /> Project Engineer— This project consisted of drainage design, construction management <br /> and peer review. Ms. Patxot was in charge of the AutoCAD plans preparation, drainage <br /> and quantity calculations. <br /> Hollywood Boulevard/SR-820 (US-1 to SR•Al A)— FDOT, District 4 <br /> Project Engineer in charge of organizing plans for Hollywood Boulevard in Hollywood. <br /> She furthermore assisted with drainage calculations and the preparation of relevant <br /> reports. <br /> SW 176th Street from SW 107th Avenue to US-1 — Miami-Dade County, Florida <br /> Project Engineer in charge of plans preparation. The scope of this project included <br /> master planning, feasibility analysis and design.After the master planning was completed <br /> then roadway design including drainage,signing and marking design proceeded. <br /> Crown Linen Laundry—Hialeah, Florida <br /> Project Engineer — Responsible for the plans preparation using AutoCAD of water and <br /> sewer systems. The scope of services included data collection, water and sewer design <br /> and plans preparation. Ms Patxot, in addition, was responsible for obtaining water and <br /> ® <br /> sewer permits from Miami-Dade County, Water and Sewer Department and the <br /> Department of Environmental Resource Management. <br /> ®io R.J.Behar SECTION 3 • PAGE 137 <br />