Laserfiche WebLink
MARLIN SCATTOLINI <br /> E. 1n Avenue, E. 47th Street, E. 48th Street- Reconstruction—City of Hialeah, Florida <br /> ® Project Designer for the design and production of roadway,drainage as well as signing and pavement marking plans <br /> E.4th Avenue Improvements—City of Hialeah, Florida- LAP/ARRA Project <br /> Field Services Engineer— Responsible for roadway, signing & pavement marking plans and milling and resurfacing. The <br /> project consists of extensive field work in order to locate roadway deficiencies over the project's 21 block span. Milling and <br /> resurfacing, ADA improvements, curb, driveway and sidewalk repairs, utility locations, and signing and pavement marking <br /> repairs were some of the aspects documented for this project. This was a FDOT Local Agency Program (LAP) project. One <br /> of the challenges of this project was to prepare roadway plans which would improve the roadway corridor while minimizing <br /> federal funds the City would have to use. This project is part of the American Recovery and Reinvestment Act (ARRA), <br /> which is supported by federal funds. Project length: 1.239 miles. <br /> Miami Dade County Lighting Projects—Miami Dade County Public Works <br /> Project Designer—The scope of the project included lighting improvements. <br /> Powerline Road (SR-845) Palm Beach County, Florida—FDOT, District 4 <br /> Project Designer — Responsible for the preparation of roadway, signing and pavement marking plans, 3R reports, plans <br /> preparation, utility coordination, pavement design and quantities. Project length: 3 miles. <br /> SR-5(US•11South Federal Highway) Broward/Palm Beach Counties, Florida—FDOT, District 4 <br /> Project Designer—She prepared the signing plans. <br /> SR-806(Atlantic Avenue) Palm Beach County, Florida—FDOT, District 4 <br /> Project Designer— Responsible for the preparation of the signing plans. The scope included milling and resurfacing (RRR) <br /> of 2.8 miles of a major arterial roadway, including drainage improvements, pavement marking and signing, lighting plans, <br /> eight signal locations, a public involvement program and landscape improvements. <br /> Town Engineer—Town of Southwest Ranches, Florida <br /> Traffic Counter—She prepared of traffic counts. <br /> Transportation Master Plan Traffic Counts—City of Hallandale Beach, Florida <br /> Traffic Counter — She performed traffic counts and data collection. This project included 24 hour counts and turning <br /> movement counts for a master plan study aimed at improving congestion within the City of Hallandale Beach. <br /> Structural Inspection and Survey—Miami-Dade County Parks & Recreation Department <br /> Project Inspector—She assisted to preparing the structural inspection and survey reports for the 75 parks. <br /> Sunrise Athletic Complex,Additional Parking—City of Sunrise, Florida <br /> Project Designer— She was responsible for the parking lot improvements. Her responsibilities included the parking layout, <br /> signing and markings,drainage and utility coordination. <br /> SE 15th Street, South Miami Road, SE 10th Avenue Intersection Improvements—City of Fort Lauderdale, Florida <br /> Project Designer—She was responsible for the preparation of design analysis plans. <br /> Seven Isles Entry Beautification—City of Fort Lauderdale, Florida <br /> Project Designer—The project consisted of improvements to the 7 Isles Entryway. These improvements included adding a <br /> parking space on the west side of SE 23b Avenue as well as beautifying two of the existing bridges. <br /> Old Davie School Improvements—Town of Davie, Florida <br /> Project Designer—She was responsible for the parking and driveway layout. The scope of this project consists of drainage, <br /> parking and utility improvements for an historical school (now converted to a museum)and adjacent park property. <br /> Coral Springs Aquatic Complex Parking Lot—City of Coral Springs, Florida <br /> Project Designer— She was responsible for the parking lot improvements. Her responsibilities included the parking layout, <br /> signing and markings, drainage and utility coordination. <br /> Wolk Park Lake Improvements—City of Lauderhill, Florida <br /> Project Designer—Prepared the lighting plans. <br /> Springtree Canal Rehabilitation—City of Sunrise, Florida <br /> Project Designer—Prepared the design plans. <br /> Guardrail Retrofit Program—Florida Turnpike Enterprise(URS Corporation) <br /> Project Designer—Responsible for the preparation of the canal safety program plans, roadway and roadway analysis plans. <br /> Monterra Traffic Control Plan, Williams Paving, Inc.—Medley, Florida <br /> Project Designer—Responsible for the preparation of MOT plans. <br /> Isles of Oakland Watermain Extension (Lennar Homes)—Broward County, Florida <br /> Project Designer—Preparation of MOT(Maintenance of Traffic) plans. <br /> ® R.J.Behar SECTION 3- PAGE I43 <br /> COMMP1IFIIUGNAL A6®CHY®AI&BielRINc SWIM FILM OMS RO(U <br /> I I - <br /> HEM FOB slummed NO.124442 <br />