Laserfiche WebLink
CITY OF SUNNY ISLES BEACH <br /> CONSUME PROFESSIONAL ARCHITECTURAL&LXE➢OIRQi6 smnas Fm16 ONLY MT <br /> REQUEST FOR QUALIFICATIONS NO.12-0442 <br /> MARLIN SCATTOLINI <br /> ® SIGNING AND MARKING <br /> tlr. .ENGINEERING EXPERIENCE <br /> h At RJ Behar, Ms. Scattolini is in charge of design and plans preparation of roadway <br /> projects, drainage plans, signing and pavement marking plans, signalization plans, as <br /> 1 14 well as permitting package. She has more than six years of experience. <br /> , j) 0 <br /> II RELEVANT EXPERIENCE <br /> 1 'Y �I SR•836 Auxiliary Lane and Interchange Improvements— Miami-Dade Expressway <br /> Authority(EAC Consulting, Inc.) <br /> Project Designer—The scope of this project is a SEIR study. RJ Behar is responsible <br /> for performing the typical section package, variance package, and drainage analyses <br /> for a 5 mile section of SR-836. <br /> SR-836 Emergency Access Ramp— Miami•Dade Expressway Authority <br /> EDUCATION Project Designer responsible for the roadway plans, traffic control plans, drainage <br /> Civil Engineering analysis, utility coordination, lighting plans, signing and marking plans, structures <br /> Universidad Metropolitana (retaining walls) and special access gates. The project consists of an emergency ramp <br /> (Caracas,Venezuela) that connects the Florida Turnpike on-ramp to the SR 836 WB extension. Project <br /> Sept 1999—Dec 2002 length: 1 mile. <br /> Miami River Greenways, Segment D—City of Miami, Florida <br /> B. S. Civil Engineering Designer— The project consists of the reconstruction of an existing roadway segment <br /> Florida International along the Miami River to produce a scenic, landscaped, pedestrian/bicycle <br /> University(Miami, Florida) walkway/greenway. The project includes the design of a drainage system with wells, <br /> May 2003—August 2006 decorative lighting and landscapemardscape design. Project length: 1 mile <br /> W. 29th Street 3R Safety Review(from Okeechobee Road to W. 4th Avenue)—City <br /> 0 ACTIVITIES/ACHIEVEMENTS of Hialeah, Florida <br /> Golden Key Honor Society Project Designer for the design and production of roadway, drainage, signing and <br /> Institute of Transportation pavement marking plans. The scope of services consisted of a 3R Safety Review, <br /> Engineering(ITE) which included crash data analysis and field observations to provide a report with <br /> ASCE American Society of recommendations to minimize the frequency of accidents. Project length: 1.5 miles <br /> Civil Engineers Palm Avenue(from West 45th Street to West 49th Street)City of Hialeah, Florida <br /> Project Designer for the design and production of roadway,drainage as well as signing <br /> SKILLS/COURSES/TRAINING and pavement marking plans. The scope of this project consisted of roadway <br /> Engineering drawing improvements, milling and resurfacing, drainage, signing and pavement markings and <br /> Fundamentals lighting plans on Palm Avenue from West 45th Street to West 47th Street and from West <br /> Various Engineering Design 47th Street to West 49th Street in the City of Hialeah. Project length:0.25 miles. <br /> courses,such as Mechanics of NW 7019th Avenue Connector(Design)—City of Fort Lauderdale, Florida <br /> Materials Project Designer — The project includes the roadway design of a 1.5 mile urban <br /> Structure design, Steel, section, 4-lane divided, connector between NW 7th and NW 9th Avenues in Downtown <br /> Concrete, Fluid & Mechanics Fort Lauderdale. The scope of this project includes signalization, drainage design, <br /> .AutoCAD signing pavement marking and permitting as well as public involvement coordination. <br /> Project Management, Problem SW 328th Street from SW 152nd Avenue to SW 137th Avenue— Miami•Dade County <br /> Solving Public Works <br /> FDOT—Specifications Designer responsible for the preparation of roadway, signing & pavement marking <br /> Package Preparation Training plans and drainage plans. The scope of the project included master planning and <br /> for Consultants feasibility analysis for the new roadway. This project involved the upgrading of the <br /> YEARS OF EXPERIENCE existing traffic signals to mast-arms and internally illuminated signs. The design phase <br /> for this project comprised of drainage, lighting, signalization, signing and pavement <br /> 6 Years markings. <br /> isYEARS WITH RJ BEHAR Hialeah High School Parking Garage-Civil Plans—City of Hialeah, Florida <br /> 2006—Present Project Designer for civil site improvements for this parking garage. Her responsibilities <br /> included the water, sewer and drainage layout, signing and pavement marking. <br /> NER.J.Behar SECTION 3 • PAGE 142 <br />