|
CITY OF SUNNY ISLES BEACH
<br /> CONSUME PROFESSIONAL ARCHITECTURAL&LXE➢OIRQi6 smnas Fm16 ONLY MT
<br /> REQUEST FOR QUALIFICATIONS NO.12-0442
<br /> MARLIN SCATTOLINI
<br /> ® SIGNING AND MARKING
<br /> tlr. .ENGINEERING EXPERIENCE
<br /> h At RJ Behar, Ms. Scattolini is in charge of design and plans preparation of roadway
<br /> projects, drainage plans, signing and pavement marking plans, signalization plans, as
<br /> 1 14 well as permitting package. She has more than six years of experience.
<br /> , j) 0
<br /> II RELEVANT EXPERIENCE
<br /> 1 'Y �I SR•836 Auxiliary Lane and Interchange Improvements— Miami-Dade Expressway
<br /> Authority(EAC Consulting, Inc.)
<br /> Project Designer—The scope of this project is a SEIR study. RJ Behar is responsible
<br /> for performing the typical section package, variance package, and drainage analyses
<br /> for a 5 mile section of SR-836.
<br /> SR-836 Emergency Access Ramp— Miami•Dade Expressway Authority
<br /> EDUCATION Project Designer responsible for the roadway plans, traffic control plans, drainage
<br /> Civil Engineering analysis, utility coordination, lighting plans, signing and marking plans, structures
<br /> Universidad Metropolitana (retaining walls) and special access gates. The project consists of an emergency ramp
<br /> (Caracas,Venezuela) that connects the Florida Turnpike on-ramp to the SR 836 WB extension. Project
<br /> Sept 1999—Dec 2002 length: 1 mile.
<br /> Miami River Greenways, Segment D—City of Miami, Florida
<br /> B. S. Civil Engineering Designer— The project consists of the reconstruction of an existing roadway segment
<br /> Florida International along the Miami River to produce a scenic, landscaped, pedestrian/bicycle
<br /> University(Miami, Florida) walkway/greenway. The project includes the design of a drainage system with wells,
<br /> May 2003—August 2006 decorative lighting and landscapemardscape design. Project length: 1 mile
<br /> W. 29th Street 3R Safety Review(from Okeechobee Road to W. 4th Avenue)—City
<br /> 0 ACTIVITIES/ACHIEVEMENTS of Hialeah, Florida
<br /> Golden Key Honor Society Project Designer for the design and production of roadway, drainage, signing and
<br /> Institute of Transportation pavement marking plans. The scope of services consisted of a 3R Safety Review,
<br /> Engineering(ITE) which included crash data analysis and field observations to provide a report with
<br /> ASCE American Society of recommendations to minimize the frequency of accidents. Project length: 1.5 miles
<br /> Civil Engineers Palm Avenue(from West 45th Street to West 49th Street)City of Hialeah, Florida
<br /> Project Designer for the design and production of roadway,drainage as well as signing
<br /> SKILLS/COURSES/TRAINING and pavement marking plans. The scope of this project consisted of roadway
<br /> Engineering drawing improvements, milling and resurfacing, drainage, signing and pavement markings and
<br /> Fundamentals lighting plans on Palm Avenue from West 45th Street to West 47th Street and from West
<br /> Various Engineering Design 47th Street to West 49th Street in the City of Hialeah. Project length:0.25 miles.
<br /> courses,such as Mechanics of NW 7019th Avenue Connector(Design)—City of Fort Lauderdale, Florida
<br /> Materials Project Designer — The project includes the roadway design of a 1.5 mile urban
<br /> Structure design, Steel, section, 4-lane divided, connector between NW 7th and NW 9th Avenues in Downtown
<br /> Concrete, Fluid & Mechanics Fort Lauderdale. The scope of this project includes signalization, drainage design,
<br /> .AutoCAD signing pavement marking and permitting as well as public involvement coordination.
<br /> Project Management, Problem SW 328th Street from SW 152nd Avenue to SW 137th Avenue— Miami•Dade County
<br /> Solving Public Works
<br /> FDOT—Specifications Designer responsible for the preparation of roadway, signing & pavement marking
<br /> Package Preparation Training plans and drainage plans. The scope of the project included master planning and
<br /> for Consultants feasibility analysis for the new roadway. This project involved the upgrading of the
<br /> YEARS OF EXPERIENCE existing traffic signals to mast-arms and internally illuminated signs. The design phase
<br /> for this project comprised of drainage, lighting, signalization, signing and pavement
<br /> 6 Years markings.
<br /> isYEARS WITH RJ BEHAR Hialeah High School Parking Garage-Civil Plans—City of Hialeah, Florida
<br /> 2006—Present Project Designer for civil site improvements for this parking garage. Her responsibilities
<br /> included the water, sewer and drainage layout, signing and pavement marking.
<br /> NER.J.Behar SECTION 3 • PAGE 142
<br />
|