|
NANETTE AKYAZ
<br /> E. 10th, 110, 12th, 13th, 14th, 15th (from East 1't Avenue to East 2nd Avenue)—City of Hialeah, Florida
<br /> Roadway Designer — She prepared roadway plans, drainage design, signing and marking and utility coordination. The
<br /> project consists of reconstruction of 3,700 feet of City Street.
<br /> E. 16th, E. 17th, E. 18th, 19th, 20th(from Palm Avenue to East 1n Avenue)—City of Hialeah, Florida
<br /> Roadway Designer — She was responsible for the roadway plans, drainage design, signing and marking and utility
<br /> coordination. The project consists of reconstruction of 3,000 feet of City Streets.
<br /> E. 16th, 18th, 19th,20th Street, Curtis Drive(from East 111 Avenue to East 2^d Avenue)—City of Hialeah, Florida
<br /> Roadway Designer — She prepared roadway plans, drainage design, signing plans, utility coordination. The project
<br /> consisted of reconstruction 3700 feet of City Streets.
<br /> West of US-1 Drainage Study Area—City of Hallandale Beach, Florida
<br /> Roadway Designer—She prepared the exhibits and area calculations for the drainage report.
<br /> Town Center Roadway Study—City of Coral Springs, Florida
<br /> Roadway Designer—She prepared layouts of the bus stations and connecting roadways for transit improvements.
<br /> OTHER SIGNIFICANT EXPERIENCE
<br /> Design/Build for the Reconstruction of SE and Street, Belle Glade, Florida—FDOT, District 4
<br /> Project Designer — She was responsible for the production of roadway plans, signing and pavement marking plans and
<br /> quantities. The scope of this project included roadway plans, drainage design, signing and marking plans and utility
<br /> relocation plans. The design included the use of filter fabric and a thick sub-base in lieu of demucking the roadway. Project
<br /> length:0.3 miles
<br /> Northlake Boulevard over the Loxahatchee Slough—Palm Beach County, Florida
<br /> Roadway Designer— The project consisted of reconstruction of a four lane divided highway, construction of a bridge, weir
<br /> and walkway. She was responsible for the geometrics, signing and pavement markings, weir placement and grading of the
<br /> channel and walkway, quantity calculations and cost estimates. Project length: 0.349 miles/bridge .007 miles.
<br /> 1-75/Griffin Road Interchange, Broward County, Florida—FOOT, District 4
<br /> Roadway Designer— The scope consists of improvements including modifications to the interchange by realigning the 1-75
<br /> ramps to converge at a new signalized intersection. Her responsibilities include the geometrics, signing and pavement
<br /> 40 markings,signalization and long range estimates. Project length: 1 mile.
<br /> US-11SR-5, St. Lucie County, Florida—FDOT, District 4
<br /> Roadway Designer—Responsible for the signalization plans.
<br /> 1-95 HOV, Palm Beach County, Florida— FDOT, District 4
<br /> Roadway Designer — Provided quality control review for two separate 1-95 HOV design contracts. The scope of services
<br /> included geometric, drainage,signing and marking,traffic control reviews.
<br /> Powerline Road(SR-845) Palm Beach County, Florida—FDOT, District 4
<br /> Roadway Designer—She was responsible for the preparation of roadway quantities, computation book and transport input.
<br /> The scope included complete design for widening and resurfacing of 3 miles of a major arterial roadway, including;drainage
<br /> design, pavement marking and signing, overhead signing plans, lighting plans, seven signal locations, structural plans
<br /> (bridge widening), a public involvement program and landscape improvements. Project length: 3 miles.
<br /> 1-95 Pump Station, Pembroke Park, Florida—FDOT, District 4
<br /> Roadway Designer—She prepared the roadway plans for reconstruction of 30th Avenue.
<br /> US-1/SR-5, Miami-Dade County Line to Hallandale Beach Boulevard—FDOT, District 4
<br /> Roadway Designer—She prepared the typical section package and quality control review.
<br /> SR-80 Crestwood to 105th Avenue—FDOT, District 4
<br /> Roadway Designer—She prepared the roadway,signing and marking and drainage plans.
<br /> SR-AIA(from County Road to Flagler Memorial Bridge) Palm Beach County, Florida—FDOT, District 4
<br /> Roadway Designer— The project consisted of milling and resurfacing of 0.25 miles of a 4-lane divided highway for FDOT,
<br /> District 4 (2000). She was responsible for the drafting of roadway plans, drainage, traffic control, signalization, utility
<br /> relocation, as well as,the design and drafting of signing and markings and lighting plans including lighting calculations. She
<br /> was in charge of the quantities input in the FDOT CES system.
<br /> Southern Boulevard (SR-80)from Forest Hill Boulevard to SR-7, Palm Beach County, Florida—FDOT, District 4
<br /> Roadway Designer—The project consisted of reconstruction of a 3 mile, 6-lane divided urban highway for FDOT, District 4
<br /> ® (2000). Her responsibilities included drafting of the roadway plans, drainage, traffic control, signalization, utility relocation,
<br /> signing and marking and lighting plans.
<br /> gill R.J.Behar SECTION 3 - PAGE 149
<br /> minims mitsuoN.LL ootmrtment a EiaNG SI17U3 FERNS our Sau
<br /> I I
<br /> MUM owIFUTrou NO.1241-02
<br />
|