Laserfiche WebLink
NANETTE AKYAZ <br /> E. 10th, 110, 12th, 13th, 14th, 15th (from East 1't Avenue to East 2nd Avenue)—City of Hialeah, Florida <br /> Roadway Designer — She prepared roadway plans, drainage design, signing and marking and utility coordination. The <br /> project consists of reconstruction of 3,700 feet of City Street. <br /> E. 16th, E. 17th, E. 18th, 19th, 20th(from Palm Avenue to East 1n Avenue)—City of Hialeah, Florida <br /> Roadway Designer — She was responsible for the roadway plans, drainage design, signing and marking and utility <br /> coordination. The project consists of reconstruction of 3,000 feet of City Streets. <br /> E. 16th, 18th, 19th,20th Street, Curtis Drive(from East 111 Avenue to East 2^d Avenue)—City of Hialeah, Florida <br /> Roadway Designer — She prepared roadway plans, drainage design, signing plans, utility coordination. The project <br /> consisted of reconstruction 3700 feet of City Streets. <br /> West of US-1 Drainage Study Area—City of Hallandale Beach, Florida <br /> Roadway Designer—She prepared the exhibits and area calculations for the drainage report. <br /> Town Center Roadway Study—City of Coral Springs, Florida <br /> Roadway Designer—She prepared layouts of the bus stations and connecting roadways for transit improvements. <br /> OTHER SIGNIFICANT EXPERIENCE <br /> Design/Build for the Reconstruction of SE and Street, Belle Glade, Florida—FDOT, District 4 <br /> Project Designer — She was responsible for the production of roadway plans, signing and pavement marking plans and <br /> quantities. The scope of this project included roadway plans, drainage design, signing and marking plans and utility <br /> relocation plans. The design included the use of filter fabric and a thick sub-base in lieu of demucking the roadway. Project <br /> length:0.3 miles <br /> Northlake Boulevard over the Loxahatchee Slough—Palm Beach County, Florida <br /> Roadway Designer— The project consisted of reconstruction of a four lane divided highway, construction of a bridge, weir <br /> and walkway. She was responsible for the geometrics, signing and pavement markings, weir placement and grading of the <br /> channel and walkway, quantity calculations and cost estimates. Project length: 0.349 miles/bridge .007 miles. <br /> 1-75/Griffin Road Interchange, Broward County, Florida—FOOT, District 4 <br /> Roadway Designer— The scope consists of improvements including modifications to the interchange by realigning the 1-75 <br /> ramps to converge at a new signalized intersection. Her responsibilities include the geometrics, signing and pavement <br /> 40 markings,signalization and long range estimates. Project length: 1 mile. <br /> US-11SR-5, St. Lucie County, Florida—FDOT, District 4 <br /> Roadway Designer—Responsible for the signalization plans. <br /> 1-95 HOV, Palm Beach County, Florida— FDOT, District 4 <br /> Roadway Designer — Provided quality control review for two separate 1-95 HOV design contracts. The scope of services <br /> included geometric, drainage,signing and marking,traffic control reviews. <br /> Powerline Road(SR-845) Palm Beach County, Florida—FDOT, District 4 <br /> Roadway Designer—She was responsible for the preparation of roadway quantities, computation book and transport input. <br /> The scope included complete design for widening and resurfacing of 3 miles of a major arterial roadway, including;drainage <br /> design, pavement marking and signing, overhead signing plans, lighting plans, seven signal locations, structural plans <br /> (bridge widening), a public involvement program and landscape improvements. Project length: 3 miles. <br /> 1-95 Pump Station, Pembroke Park, Florida—FDOT, District 4 <br /> Roadway Designer—She prepared the roadway plans for reconstruction of 30th Avenue. <br /> US-1/SR-5, Miami-Dade County Line to Hallandale Beach Boulevard—FDOT, District 4 <br /> Roadway Designer—She prepared the typical section package and quality control review. <br /> SR-80 Crestwood to 105th Avenue—FDOT, District 4 <br /> Roadway Designer—She prepared the roadway,signing and marking and drainage plans. <br /> SR-AIA(from County Road to Flagler Memorial Bridge) Palm Beach County, Florida—FDOT, District 4 <br /> Roadway Designer— The project consisted of milling and resurfacing of 0.25 miles of a 4-lane divided highway for FDOT, <br /> District 4 (2000). She was responsible for the drafting of roadway plans, drainage, traffic control, signalization, utility <br /> relocation, as well as,the design and drafting of signing and markings and lighting plans including lighting calculations. She <br /> was in charge of the quantities input in the FDOT CES system. <br /> Southern Boulevard (SR-80)from Forest Hill Boulevard to SR-7, Palm Beach County, Florida—FDOT, District 4 <br /> Roadway Designer—The project consisted of reconstruction of a 3 mile, 6-lane divided urban highway for FDOT, District 4 <br /> ® (2000). Her responsibilities included drafting of the roadway plans, drainage, traffic control, signalization, utility relocation, <br /> signing and marking and lighting plans. <br /> gill R.J.Behar SECTION 3 - PAGE 149 <br /> minims mitsuoN.LL ootmrtment a EiaNG SI17U3 FERNS our Sau <br /> I I <br /> MUM owIFUTrou NO.1241-02 <br />