My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2016 4:20:03 PM
Creation date
2/1/2016 4:14:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY Y ISLES BEACH <br /> LONRNmi6 PROI USIONAL ABDIIIECRBAL&ENGINEERING Swims MKS ONLY MA) <br /> OHM HMI QVALMCAnox%NO.12.04-oz NANETTE AKYAZ <br /> ® STREET HIGHWAY DESIGN AND SIGNALIZATION <br /> ENGINEERING EXPERIENCE <br /> At RJ Behar, Ms. Akyaz is responsible for plans preparation in both MicroStation and <br /> CAD software for roadway and civil engineering projects. She has ten years of <br /> experience in plans preparation on civil engineering projects. <br /> . fj! <br /> i, ? s , RELEVANT EXPERIENCE <br /> { MUNICIPAL EXPERIENCE <br /> Palm Avenue(W. 45th Street to W.47th Street)—City of Hialeah, Florida <br /> ssr <br /> Roadway Designer- She prepared the plans for milling and resurfacing Palm Avenue <br /> \/ from East 45th Street to East 47th Street. The project also included adding curb ramps <br /> to comply with ADA standards, replacing sidewalk, driveways and curb and gutter as <br /> t needed, cleaning, sealing and adjusting drainage manholes and inlets and signing and <br /> pavement markings <br /> EDUCATION Wilde Park—City of Hialeah, Florida <br /> Roadway Designer—She prepared the site, paving and drainage design plans. <br /> • A.A. Degree—Broward Bucky Dent Park Design—City of Hialeah, Florida <br /> Community College, Davie. Roadway Designer— Responsible for the design to address flooding problems at the <br /> Florida 1992 (Graduated with park. <br /> Honors) Milander Park Streetscape—City of Hialeah, Florida <br /> Roadway Designer — She prepared master plans for East 47th and East 48th Street <br /> PROFESSIONAL TRAINING from Palm Avenue to East 151 Avenue. <br /> • 2002 FDOT Cadd Update West 37th Street—City of Hialeah, Florida <br /> ® Training Seminar Roadway Designer— Responsible for the roadway plans for reconstruction of W 370 <br /> 2002 FDOT PPM Design Update Street. <br /> Training East 4th Avenue Street Assessment—City of Hialeah, Florida <br /> Florida International University - Roadway Designer—She was responsible for the drafting of driveways, sidewalks and <br /> AutoCAD Release 12 ADA ramps;curb and gutter, drainage, pavement, and utilities. The scope consisted of <br /> FDOTIFICE - Load and general engineering services for the assessment of sidewalks, ADA compliance and <br /> Resistance Factor Design cost estimate for repairs or reconstruction of sidewalks of two segments of this <br /> (LRFD) Training roadway; from Hialeah Drive to East 21st Street and from East 32nd Street to East 53rd <br /> • Geopak Road 1 Training Street. Project length: 2.58 miles. <br /> E. 6th Avenue (from E. 9th Street to Hialeah Drive), E. 5th Street (from E. 4th <br /> Avenue to E. 6th Avenue), E. 5th Street(from E. 6th Avenue to E. 8th Avenue)—City <br /> YEARS OF EXPERIENCE of Hialeah, Florida <br /> 10 Years Roadway Designer—She was responsible for the drafting of roadway plans, drainage, <br /> traffic control, signalization, utility relocation, as well as the design and drafting of <br /> YEARS WITH RJ BEHAR signing and markings plans and lighting including lighting calculations. <br /> 2001 -Present E. 1n Avenue—City of Hialeah, Florida <br /> Roadway Designer — She prepared roadway plans, drainage design, signing and <br /> marking, signal plans, conversion of overhead to underground utilities. The project <br /> consisted of the reconstruction of 1.6 miles of City Street, conversion from one-way to <br /> two-way traffic. <br /> E. 10th, 11th, 12th, 13th, 14th, 15th Street (from Palm Avenue to East 1st Avenue) — <br /> City of Hialeah, Florida <br /> Roadway Designer- Prepared roadway plans, drainage design, signing and marking. <br /> The project consisted of reconstruction of approximately 3700 feet of City Street. <br /> II <br /> LW R.J.Behar SECTION 3 • PAGE 148 <br />
The URL can be used to link to this page
Your browser does not support the video tag.