Laserfiche WebLink
CITY OF SUNNY ISLES BEACH <br /> CONTATLi6 PROFESSIONAL ABTUCTERAL&ENGINEERIN6 SERVICES FIRMS ONLY(COW <br /> REQUEST FOR QUALIFICATIONS NO.1244-02 <br /> DALTON POLANCO, El <br /> CONSTRUCTION PROJECT MANAGEMENT <br /> ENGINEERING EXPERIENCE <br /> Mr. Polanco is a Civil Engineer with over 21 years of experience in the supervision, <br /> inspection, testing and design of roadway, utilities and building projects. He has <br /> worked on water works, transportation,geotechnical and environmental projects. <br /> RELEVANT EXPERIENCE <br /> S-332D Pump Station Hardening, Construction Management, Miami•Dade <br /> County, Florida—South Florida Water Management District <br /> EDUCATION Construction Inspector— This project involved the hardening and upgrading of the S- <br /> B. S. Civil Engineering, Florida 332D Pump Station located near Homestead, Florida in Miami-Dade County. The <br /> State University, 1998 project involved the hurricane hardening of the pump house and the installation of <br /> Associates in Science, bullet-proofing for the walls, roof and roofing system, exterior doors, louvers, HVAC <br /> Tallahassee Community College, upgrades and protective opening hoods. The scope also included new weather-proof <br /> 1994 roof-mounted equipment access hatches, an OSHA safety ladder and roof perimeter <br /> safety railings and overall exterior repainting of the pump house walls and supporting <br /> PROFESSIONAL exterior concrete foundations, as well as con construction management and <br /> REGISTRATIONS inspection support services. <br /> Engineer Intern, Florida License No. S-331 Pump Station Hardening, Construction Management, Miami•Dade <br /> 1100003005, 1998 County, Florida—South Florida Water Management District <br /> Construction Inspector—The scope of this project consisted of providing construction <br /> ® CTQP # P45216553 management and inspection support services for the hardening of Pump Station S- <br /> 331. The pump station is located on the L-31 Borrow Canal. The project involved the <br /> LICENSES/CERTIFICATIONS hurricane hardening of the pump house to include demolition and repair work, <br /> CTQP Asphalt Paving Technician reinforced grout/concrete/structural steel strengthening of existing concrete masonry <br /> Level I-II walls, reroofing, personnel/overhead door replacements, miscellaneous metal and <br /> CTQP Concrete Field Technician louver work with sealing/caulking and exterior coating/refinishing work. <br /> Level I G420/G422 and S•26 Roof Replacement, Construction Management, Miami- <br /> CTAP Earthwork Construction Dade County, Florida—South Florida Water Management District <br /> Inspection Level I-II Construction Inspector—The scope of this project consisted of providing construction <br /> • CTQP Final Estimates Level I-II management services for roof replacement work at structures G-420,G-422 and S-26 <br /> • ACI Concrete Field Testing in north central Miami-Dade County. The project work consisted of the design and <br /> Technician Grade I construction of new roofing systems, structural repairs and providing roof accessibility <br /> • CPN Radiation Safety and Use to three (3) buildings: Pump Stations G420, G422 and S26, which are located in <br /> Nuclear Gauges Miami-Dade County, Florida. <br /> • FDOT LBR Technician W. 53b Street (W. 4th Avenue to W. 8th Avenue) Construction Engineering <br /> FDOT Asphalt Plant Level I Inspection — American Recovery and Reinvestment Act — City of Hialeah, <br /> Work Zone Traffic Control Florida <br /> Intermediate Level Roadway Inspector in charge of street reconstruction for West 53ra Street from West <br /> • HAZWOPER 40 HR Training 8th Avenue to West 12 h Avenue within the City of Hialeah. The general overview and <br /> • Nuclear Gauge Safety Training scope for this project comprised the complete reconstruction of West 53rf Street, <br /> /Hazmat Training including new sidewalk, curb and gutter, drainage improvements - new drainage <br /> CMEC Concrete Cylinder Testing inlets,18"storm sewer cross drainage pipe, 18"exfiltration trench(French Drain). <br /> Also, proposed in the project scope are pavement milling and resurfacing, signing <br /> YEARS OF EXPERIENCE and pavement markings, and grading of the adjacent swale areas and sod restoration <br /> 21 Years with Performance Turf. Project length: 0.5 miles. <br /> ® YEARS WITH RJ BEHAR <br /> 2008—Present <br /> ® [IR.J.Behar SECTION 3 • PAGE 151 <br /> lb <br />