My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HBC Engineering Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
HBC Engineering Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2016 4:20:40 PM
Creation date
2/1/2016 4:19:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ri7•= Eii a �• * 'f(t�� ttYcLfi a-6 7-aty.t{,l � . <br /> \...2.1_ <br /> yisB• Pny <br /> . - �R; i ] <br /> l t� g ; ' <br /> skew e ,ka:Lis't fms i r a !, <br /> Pi <br /> .• , 1K _ ■ip . �p�l —• : , - 4 S - l"ffit <br /> 'NE • INB'. COMPANY-' - . <br /> [? -c- City.of Sunny.Isles Beach'I Request for Proposal No. 12-04-02.-:-..;,--of-a-,5‘,._.., M4rt,2012 f 1 <br /> Section 2 <br /> Qualifications <br /> HBC is poised to undertake the responsibility of becoming an extension of the City of Sunny <br /> Isles Beach dynamic development and growth impetus by providing the-technical-talent needed- -- - <br /> in all areas of Civil and Traffic Engineering. The combined-human resource at the disposal of the <br /> City of Sunny Isles Beach will be immense. The professionals at HBC have worked and <br /> continue to work with municipal clients and the foot print of their fine work is all over Dade <br /> County. Below are the condensed profiles of key personnel assigned to this project. <br /> Edgar Din P.E.- Project Manager and Utilities Engineering Lead <br /> Mr. Diaz has more than 25 years of responsible and diversified experience in design and <br /> construction of municipal and public works infrastructure projects. His experience translates into <br /> unparalleled expertise in project management. He has the ability to successfully assemble and <br /> manage multi-disciplinary teams and assignments, oversee planning of transportation projects as <br /> well as conduct quality assurance and quality control (QA/QC), and deliver projects on time and <br /> on budget, while maintaining good client and public relationship: As a-Civil Engineer with a <br /> ® Master of Science degree, Edgar has performed in various capacities that include project <br /> management from concept to final design, and responsibility for post design services, such <br /> projects included but not limited to water, sewer, pump stations, roadways, drainage; and tunnel <br /> design. He supervised engineers, planners and technicians directly responsible for developing <br /> design and construction plans for various types of roadway projects including interstate, arterial, <br /> and local roads. He managed a $1.2 billion design-build-operate-maintain (DBOM) project for <br /> the Port of Miami Tunnel, MacArthur Cswy. to Dodge Island. He currently serves as the Vice <br /> President for HBC Engineering Company. <br /> Adebayo T. Coker P.E. - Civil Engineering Design Lead <br /> - - -Mr, Coker-i§ a transportation engineer with over 20-years-of fespon§ible and diversified -- <br /> experience in the planning, design, construction management and the supervision of project <br /> personnel on major FDOT transportation projects. His particular areas of expertise are in <br /> production and management of all phases of roadway design-projects including preliminary and • <br /> final-design of limited/controlled access highways and_freeways; Rural and.Urban- Resurfacing,__ <br /> Restoration and Rehabilitation (RRR) projects: and construction engineering inspection (CEI). <br /> He has managed and provided technical leadership on a number of public and private sector- <br /> projects. He has taken numerous projects from the planning phase through design, construction <br /> and post design services. He has been responsible for coordination with clients, sub consultants, <br /> permitting agencies, and reviewers of all project disciplines. He has implemented effective <br /> quality control and quality assurance plan (QA/QC) for various clients. He successfully <br /> ® coordinated more than $200 million of roadway design projects. Mr. Coker served_ as FDOT <br /> District presidedof Project Development Engineer. As presideof HBC Engineering, he is -a-dedicated, <br /> 13155 5W 134th Street,Suite 207,Miami,Florida 33186 (305)232-7932 Phone (305)232-7933 Fax <br /> www.hbcengineeringco.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.