Laserfiche WebLink
{ -tirt `�. fi �•4 ! pp �' ''^' ',7nsle B� Enf L �� '�"� 1tt :{7tv+ .., t 3p ;If a ` i. +, i ..-g150..1/2‘,11" �o'a' --as .1 V. <br /> '��r` <br /> %t <br /> � s <br /> R • y. <br /> � 3: -Vl wl",��t �tr'5Y-it <br /> 1 $, �.� lrt� : marl <br /> 1 Y �t t {r+�.:H {�A _ <br /> ri -- — ii ,. �i► .cN6�NEERIN6' COMPANI <br /> [1 ;t-zCity.of Sunny Isles Beach- Request-for Pro <br /> posalNo. 12-04-02 =- -a c;4-, 2012. t. `."1 <br /> • CLIENT NAME: University of Virginia <br /> PROJECT NAME: Unoversity of Virginia Water Supply System Modeling <br /> Beg Date: 2004 - 2007 <br /> Evaluation of the water system network serving the University of Virginia in <br /> Charlottesville, VA. Develop a WaterCad model of the sanitary sewer Force Main <br /> network for the entire 28 Square Mile city and coordinate with neighboring <br /> interconnected facilities. <br /> • Corridor Plans <br /> The president of HBC, Mr. Adebayo T. Coker, P.E., while working for the Florida Department of <br /> Transportation (District 6), performed scoping reports for many FDOT corridors of which the <br /> selected projects are listed below:-- - <br /> • South Dixie Highway <br /> • SW 72"" Street/Sunset Drive <br /> • SW 107th Avenue, SW 8th Street/Tamiami Trail <br /> • Macarthur Causeway/Collins Avenue <br /> • NW 79th Street/NE 79th Street <br /> • NW 81'/NW 82""/NE 82"" streets <br /> • NW 183`" Street/ Miami Gardens Drive <br /> • NW 7th Avenue <br /> The following project examples will give the City a cross section of HBC's expertise in the <br /> ® Corridor Planning,Roadway Design and Parking Studies. _ <br /> > 1-595 CORRIDOR ROADWAY IMPROVEMENTS PROJECT, <br /> AECOM/FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT), <br /> DISTRICT 4, BROWARD COUNTY, FLORIDA: - <br /> HBC performed interdisciplinary coordination of structural, geotechnical, utilities, <br /> drainage, MOT, SUE, and surveying for this Private-Public Partnership project (P3) <br /> which extends from 1-75 to 1-95: Reviewed engineering design plans for roadway, <br /> utilities, drainage, ITS, signalization, structures, TCP and lighting. Coordinated and <br /> scheduled survey, geotechnical, CCTV, and SUE field activities. Oversaw project <br /> scheduling, cost estimate, weekly design meeting, permits, landscaping, roadway, <br /> ITS, Geotechnical reports, miscellaneous structures, bridge, emergency access gate <br /> design, power design plan submittal packages. Attended meeting with local <br /> municipalities and permit agencies to present project and report status. Performed - <br /> public involvement and attended public meetings. Supervised design activities and <br /> coordinated personnel. Generated as-built plans, drainage structures sheets, and ITS <br /> Hub Site Plan Design. Coordinated driveway modifications and generated driveway <br /> sketches. Performed license agreement documentation, coordinated with property <br /> owners and responded to project requests. Duration: 3/2009—Present <br /> > SW 147th AVE. FROM SW 17th STREET TO SW 26th STREET, MIAMI-DADE <br /> PARKS & RECREATION, MIAMI-DADE COUNTY, FLORIDA: <br /> HBC was responsible for the design of the horizontal and vertical alignment, storm <br /> drainage system, cross sections, and drainage structures for the proposed <br /> ® reconstruction project. The project required extensive coordination with South <br /> Florida Water Management District and DERM to acquire the environmental permits <br /> - - <br /> - 13155 SW 1341h Street,Suite 207,Miami,-Florida 33186 (305)232-7932 Phone- (305)232-7933 Fax- - • - <br /> www.hbcengineeringco.com - <br />