{ -tirt `�. fi �•4 ! pp �' ''^' ',7nsle B� Enf L �� '�"� 1tt :{7tv+ .., t 3p ;If a ` i. +, i ..-g150..1/2‘,11" �o'a' --as .1 V.
<br /> '��r`
<br /> %t
<br /> � s
<br /> R • y.
<br /> � 3: -Vl wl",��t �tr'5Y-it
<br /> 1 $, �.� lrt� : marl
<br /> 1 Y �t t {r+�.:H {�A _
<br /> ri -- — ii ,. �i► .cN6�NEERIN6' COMPANI
<br /> [1 ;t-zCity.of Sunny Isles Beach- Request-for Pro
<br /> posalNo. 12-04-02 =- -a c;4-, 2012. t. `."1
<br /> • CLIENT NAME: University of Virginia
<br /> PROJECT NAME: Unoversity of Virginia Water Supply System Modeling
<br /> Beg Date: 2004 - 2007
<br /> Evaluation of the water system network serving the University of Virginia in
<br /> Charlottesville, VA. Develop a WaterCad model of the sanitary sewer Force Main
<br /> network for the entire 28 Square Mile city and coordinate with neighboring
<br /> interconnected facilities.
<br /> • Corridor Plans
<br /> The president of HBC, Mr. Adebayo T. Coker, P.E., while working for the Florida Department of
<br /> Transportation (District 6), performed scoping reports for many FDOT corridors of which the
<br /> selected projects are listed below:-- -
<br /> • South Dixie Highway
<br /> • SW 72"" Street/Sunset Drive
<br /> • SW 107th Avenue, SW 8th Street/Tamiami Trail
<br /> • Macarthur Causeway/Collins Avenue
<br /> • NW 79th Street/NE 79th Street
<br /> • NW 81'/NW 82""/NE 82"" streets
<br /> • NW 183`" Street/ Miami Gardens Drive
<br /> • NW 7th Avenue
<br /> The following project examples will give the City a cross section of HBC's expertise in the
<br /> ® Corridor Planning,Roadway Design and Parking Studies. _
<br /> > 1-595 CORRIDOR ROADWAY IMPROVEMENTS PROJECT,
<br /> AECOM/FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT),
<br /> DISTRICT 4, BROWARD COUNTY, FLORIDA: -
<br /> HBC performed interdisciplinary coordination of structural, geotechnical, utilities,
<br /> drainage, MOT, SUE, and surveying for this Private-Public Partnership project (P3)
<br /> which extends from 1-75 to 1-95: Reviewed engineering design plans for roadway,
<br /> utilities, drainage, ITS, signalization, structures, TCP and lighting. Coordinated and
<br /> scheduled survey, geotechnical, CCTV, and SUE field activities. Oversaw project
<br /> scheduling, cost estimate, weekly design meeting, permits, landscaping, roadway,
<br /> ITS, Geotechnical reports, miscellaneous structures, bridge, emergency access gate
<br /> design, power design plan submittal packages. Attended meeting with local
<br /> municipalities and permit agencies to present project and report status. Performed -
<br /> public involvement and attended public meetings. Supervised design activities and
<br /> coordinated personnel. Generated as-built plans, drainage structures sheets, and ITS
<br /> Hub Site Plan Design. Coordinated driveway modifications and generated driveway
<br /> sketches. Performed license agreement documentation, coordinated with property
<br /> owners and responded to project requests. Duration: 3/2009—Present
<br /> > SW 147th AVE. FROM SW 17th STREET TO SW 26th STREET, MIAMI-DADE
<br /> PARKS & RECREATION, MIAMI-DADE COUNTY, FLORIDA:
<br /> HBC was responsible for the design of the horizontal and vertical alignment, storm
<br /> drainage system, cross sections, and drainage structures for the proposed
<br /> ® reconstruction project. The project required extensive coordination with South
<br /> Florida Water Management District and DERM to acquire the environmental permits
<br /> - -
<br /> - 13155 SW 1341h Street,Suite 207,Miami,-Florida 33186 (305)232-7932 Phone- (305)232-7933 Fax- - • -
<br /> www.hbcengineeringco.com -
<br />
|