Laserfiche WebLink
1 3 � eri ^a• '' :•. `. ris.f h„'�rftk ,l ��.ny isie_� e'£ni -. s ... <br /> { 1� 1i4 <br /> L L� n �_ �l <br /> �4 . �`rA. v �r .31,�. tI.;:::41,. AI-4,1'� — r xa� `� e L_3J{ <br /> si o ;0 Ilei 44--` t i r 4d p ,. _ ft <br /> a- ;a}..zts-"r ..T AUK"tElYr :=i-. '-1y- • is !4 ' �;_ ." = "iC=` d!1 WWhiiE • lN61 M ANYA r <br /> �- z City',of Sunny lslerBeach`i Request-for Proposal No.-12 04 02 :a�� q�c <br /> - - � �-"c_ .May 4 ,2012 ~:.f:'. <br /> IP c <br /> for the proposed construction. Also generated signing and pavement marking plan, <br /> lighting and traffic control plans. Duration: 6/2009 - Present <br /> > NW 36th STREET-NW 7i6 AVE TO NE 7th AVE(MIAMI FL): <br /> Design the on-street and off-street parking for 1.4 mile roadway <br /> reconstruction project. Task performed included layout of the parking, paving <br /> and grading design, evaluation of the entrances and egress from adjacent <br /> properties, signalization plans, lighting design, landscaping and aesthetic ' <br /> enhancement, generation of special profiles and plateau intersection layouts, <br /> horizontal and vertical alignment design with special emphasis on the back of <br /> sidewalk profile, earthwork calculations,_ traffic_ counts and intersection <br /> analysis and improvements. <br /> • WINTER HAVEN CSX INTERMODAL LOGISTICS CENTER, POLK <br /> COUNTY, FLORIDA: <br /> -The project occupies approximately 318 -acres and supports an Major <br /> Intermodal Terminal operation in addition to CSX's Automotive Service <br /> operation. Responsible for the preparation of site construction documents <br /> for both facilities, design of a new 2.2 mile road. Specific disciplines <br /> included the site geometric layout, paving and grading, main access road, - - _ <br /> ® site roadways, water and sewer distribution, utilities, parking facilities, <br /> signalized intersections, pavement markings and signing, and <br /> coordination with local and state permitting agencies as well as multi <br /> disciplinary firms. <br /> • Traffic Engineering & Transportation Consulting <br /> Traffic Operations and Analysis <br /> • FDOT DISTRICT-4 WIDE TRAFFIC SIGNAL TIMINGS <br /> IMPLEMENTATION: <br /> Project analysis and task managers for the District-wide Traffic Signal <br /> - - --- -Timings Implementation -for Palm -Beach and Martin Counties. This <br /> project included evaluating and re-timing more than 100 intersections <br /> along six major corridors. Conducted travel time and delay studies, <br /> prepared and evaluated SYNCHRO models for existing conditions and <br /> developed new signal timings, updated clearance intervals and prepared <br /> reports summarizing the results. <br /> • PINELLAS COUNTY ON-CALL TRAFFIC ENGINEERING <br /> SERVICES, FL: <br /> ® Project analysis and task managers for preparing SYNCHRO models, <br /> evaluating signal timings, and performing before - after studies for seven <br /> - -- 13155 SW 134th Street,Suite 207,Miami,Florida 33186 (305)232-7932 Phone (305)232-7933 Fax <br /> www.hbcengineeringco.com _____-__ __ <br />