Laserfiche WebLink
ti <br /> ti <br /> iY3± btYiVS4 <br /> It <br /> l u i l::- 4 -tiv:Nd11 BIN63COMPANYa - <br /> Eric._City.of Sunnyisles Beach- Request for Proposal No. 12-04-02 :--5-c. t c - M`,2012-----5-C.-1 <br /> Traffic Signal Design <br /> > HILLSBOROUGH COUNTY: <br /> Evaluated traffic signal poles and designed their relocation at several <br /> signalized intersections for Hillsborough County. Investigated <br /> underground utilities at project locations, coordinated with utility <br /> companies for their existing utility plans, field verified existing <br /> conditions, prepared CAD drawings showing the proposed design and <br /> prepared memorandum summarizing the findings. <br /> ITS Operations and Design <br /> OCALA/MARION COUNTY ITS STRATEGIC PLAN-OCALA. FL: <br /> Prepare an Intelligent Transportation Systems (ITS) strategic plan for the <br /> City of Ocala and Marion County program. Adopted System Engineering <br /> process in the development of the strategic plan. Mapped the project to <br /> the FDOT District-5 Regional Architecture, developed Concept of <br /> Operations and documented Functional Requirements, coordinated with <br /> ® stakeholders for operations procedure during incident management, <br /> provided input and review comments on the Incident Response Plan <br /> User's Manual, Coordinated with local government agencies, utility <br /> companies and other consultants for obtaining communication plans, <br /> roadway plans and other traffic-related plans. Designed and developed <br /> construction plans, specifications and project cost estimate. ITS <br /> technologies considered to address the identified operational needs <br /> include • Traffic Signal Systems• Traffic Sig. Priority CCTV <br /> Surveillance • Data Communications. <br /> LINEBAUGH AVENUE ITS DESIGN SERVICES, HILLSBOROUGH <br /> COUNTY, FL: <br /> Assisted in the design of a fiber optic infrastructure along Linebaugh <br /> Ave. from Race Track Rd. on the west, to Sheldon Rd. on the east (a <br /> distance of 4.3 miles), and then south on Sheldon Rd. from Linebaugh <br /> Ave. to a fiber communications hub station on Waters Avenue in Tampa. <br /> Responsibilities included inventory of existing infrastructure, preparation <br /> of design plans, specifications and cost estimates for the proposed plan. <br /> Also coordinated with local utility companies to resolve any utility <br /> ® conflicts along the proposed communication path. <br /> 13155 5W 134th Street,Suite 207, Miami, Florida 33186 (305)232-7932 Phone (305)232-7933 Fax <br /> www.hbcengineeringco.com <br />