Laserfiche WebLink
• <br /> ® �t`�e , Calvin. Giordano 8 Associates. Inc. <br /> y --. <br /> I _ IE1dhb0t <br /> SOLUTIONS <br /> 0 <br /> ® COMMUNITY ENHANCEMENT PROJECT, PHASE III <br /> O Bay Harbor Islands, Florida <br /> ® ..�. - , "SI qI (Jr4�-.1 <br /> ", t ,'I ,t Client <br /> ® _ ;-: I 7(. r <br /> �.z I. 1-. Town of Bay Harbor Islands <br /> ® :14,ST�T�Ngi (t '�£:-/l ,t - t y . ., , <br /> 5 a.,., vt: - if"4.4. I Contact information <br /> ® '_gn+ r 1 p p c' . e Ell , at time of project: <br /> • 7 ; t'- "�e a rf - I I)T.- _Pm 0 11''}�t 4 y �_ Ron Wasson <br /> •r ._" i .r j 4..s s f :'s City Manager <br /> • P‘1:44.,R „ L ,1i,. II � i� •,•'zc ! �;�;� 9665 Bay Harbor Terrace <br /> S‘'` .;;•,.,c,.-_,--;:::-#17.),`,., <br /> •,,.,s� 4. '�cre'= 1 •:-4. ' 1,;; _1•,-Alit---etas,-;----z.,-1-� 'it' S- Bay Harbor Islands, FL <br /> ® • <br /> ;, 44'it 4,i„i1:4(4.1“----tr...,ti ' /.: ,�fiA 's i t�rr. .•.� . \\ o • .`j 3 •_ rz-z 33154 <br /> c ' ►i'. i►■ILa 1. 1 L r _ . A • (305)866-6241 <br /> B 1, ..-•-�i r t.,�l it • 5130 (305)866-4863(fax) <br /> ® 1 "lin�; A _ e�- i bayharborislands.net <br /> • <br /> - ., a .x.. x r >-'t- -t), c Project Date <br /> 01 <br /> • <br /> �.rJ_t ""z_ ' „fri , e 2011-2012 <br /> at . <br /> S . . _ - - ;, E.- - _ Services Provided <br /> � v : . <br /> • _- - _— = :`y' Construction Administration <br /> ----- --�• z,?� .- `--*s=� Roadway Design <br /> ® - - _, _ <br /> �� ��: .., � .�-` _ • Civil Engineering <br /> Y — <br /> • Calvin, Giordano & Associates is constructing water main, roadway and streetscape Landscape <br /> • improvements for the Town of Bay Harbor (Contract No. BHI-143) located on the North Island, Principal in Charge <br /> ® north and south of Kane Concourse. The project includes: <br /> Dennis J.Giordano <br /> • Roadway,water,drainage,and landscape improvements throughout the Project area <br /> e • Permit applications and certifications Project Manager <br /> ® • Assist in bidding process, pre-bid, bid opening, award recommendation and contract <br /> execution Sabrina M. Baglieri <br /> ® • Meeting with Contractor and appropriate regulatory agencies when requested and necessary <br /> ® for consultation or conferences in regard to construction of the project Team Members <br /> S . Issue interpretations and clarifications of the Contract Document and evaluate requested Patrick Rowena <br /> • deviations from the approved design or specifications. In connection therewith, review, Don Windham <br /> ® prepare and process any work change directives or change orders requested by the Bruce Bernard <br /> ® Contractor,or Town Hai-gel Rubi <br /> • Review and process shop drawings, samples and other data which the Contractor is required <br /> ® to submit Construction Cost <br /> ® • Make daily inspections for compliance with plans and specifications. Make interim <br /> inspections for substantial completion; review, approve and process pay requests and S6, 121,160 <br /> ® perform a final inspection to determine, in general, if the work has been completed in <br /> conformance with the intent of the Contract Documents <br /> 0 • Review as-built provided by the Contractor <br /> ® • Review and process closeout packages <br /> 0 <br /> 0 Page 21 10 <br />