Laserfiche WebLink
• <br /> • NAIICalvin, Giordano & Associates, Inc. <br /> tEYCEV7I0NAl 50lU1ION5 <br /> • } <br /> ® Karl Kennedy,PE, Page 3 <br /> • Prepared rate studies for the Utilities in order to estimate the revenue requirements to ensure that <br /> • each utility will operate on a financially self-sufficient basis. The studies included collecting, reviewing <br /> and evaluating historical and current financial records, operation and maintenance reports, forecasting <br /> customer growth, water consumption and wastewater for each customer class, reviewing capital <br /> • improvement programs. Reports were prepared for these studies. This technical report included the <br /> • data and tabular displays of the analysis listed above. The reports were presented to the City <br /> Commissions along with conclusions and recommendations at public meetings on this rate study. <br /> • • Prepared a Utilities master Plan to examine the existing utility system within the Tow of Davie's utility <br /> • service area. Estimates of the projected water and sewer needs were made. The physical condition of <br /> the Town's infrastructure was examined. Modeling of entire water and sewage transmission system <br /> • <br /> was performed. WaterCad was software used. Recommendations for improvements to the existing <br /> • infrastructure were made as well as recommendations for new infrastructure. The following items <br /> • were examined: Drinking Water, Pumping and Distribution System, Storage Tanks, Water Supply, <br /> Water Treatment Facilities, Wastewater Collection System, Wastewater Transmission Piping, Pumping <br /> • System,Wastewater Treatment Facilities <br /> • • Coordinated design of two High Density Polyethylene (HDPE) pipe Horizontal Directional Drills for the <br /> • City of Dania Beach under two different SFWMD canals. One crossing was under the Dania Cut Canal <br /> and the other under the C-10 canal. The scope of the project included 1,000 L.F. (Linear Feet) of new <br /> I• 12" W.M. HDPE pipe, tie-ins and hot taps to existing water mains, water service connections, and the <br /> • removal of existing pipe. The project was conducted on an expedited schedule to meet key deadline set <br /> by FDOT utility relocation schedule. <br /> • <br /> • Sewage Pumping Station Design - Directed the design of new and replacement pumping stations using <br /> • both dry pit pump designs and submersible pump designs from 2.5 Hp to 175 Hp pumps. Designs <br /> • included new concrete valve vaults, discharge piping, new concrete pads, fencing and landscape. The <br /> existing wet wells and receiving manhole were structurally rehabilitated. Stations included electrical <br /> • control panels as well as some received separate emergency back-up generators. <br /> • • Can Pump Station Conversions - Directed the design of many replacement of existing pumps in the <br /> • adjacent dry well with new submersible, non-clog pumps in the wet well. The wet wells are generally <br /> rehabilitated to prevent infiltration unless the wet well is not of sufficient capacity and then the wet <br /> • well is converted to the terminal manhole and a new wet well is designed adjacent to the existing <br /> ® structure. The stations are bypassed during construction, which also included installation of new <br /> submersible pumps, emergency electrical connections and site landscaping. <br /> • <br /> • Performed computer modeling of water distribution and wastewater transmission systems using <br /> • WaterCad modeling software for utilities serving from 35,000 to 165,000 customers. <br /> • • Contract City Engineer for six years for a city with a population of over 65,000. Responsible for all <br /> capital improvement projects including water,sewer, drainage, paving, landscaping and traffic projects. <br /> • Projects included new stormwater pumping stations, roadway widening with additional travel lanes, <br /> • bike lanes and bus shelters, installation of traffic signals, installation of round-a-bouts, construction of <br /> • new parks and upgrades to existing parks, construction of a new city hall, construction of a public <br /> works complex with fueling station, installation of SCADA on all pumping stations. Duties include <br /> issuance of engineering permits, coordination of inspection associated with those permits, review of <br /> • site plans,attendance at staff meetings and all City Commission meetings. <br /> • Prepared Engineering Standards for two municipalities. <br /> • • Managed the Manatee Isles Drive Improvements project. This is two lane divided roadway, with turn <br /> • lanes, in a residential area, connecting several neighborhoods to an elementary school on the east end <br /> • and Florida Nature and Cultural Center on the west end. This project included added bicycle lanes, <br /> sidewalk, LED street lighting, drainage improvements, curb and gutter and improved school zone <br /> • markings at the Elementary School. Construction management services we also performed. <br /> Page 31 12 <br />