Laserfiche WebLink
• <br /> • et, .. Calvin. Giordano & Associates, Inc. <br /> (-j ' EXCEPTIONAL SOLUTIONS <br /> • <br /> ® Robert F.McSweeney, Page 3 <br /> • Wiles Road Extension: Broward County, FL, (2002), West of Lyons Road to West of Florida's Turnpike: <br /> • Senior Project Administrator for the roadway extension of a multi-lane divided section including drainage, <br /> utility installations (water main, gravity sewer, force main and lift station modifications), signalization <br /> • modifications, roadway lighting, landscaping and irrigation, and pavement markings and signage. <br /> • <br /> N.W. 12th Street: Miami-Dade County, FL, (2000-2002), West of N.W. 107th Avenue to East of N.W. 136th <br /> •S Avenue: Senior Project Administrator for the roadway construction and/or widening of a multi-lane <br /> • divided section including bulkhead/seawall installation, culvert(s) extensions, roadway foundation <br /> • stabilization (geo-textile installation), concrete barrier wall installation, drainage, utility installations <br /> (water main and force main), railroad crossing modification, signalization, roadway lighting, landscaping <br /> ® and irrigation, and pavement markings and signage. <br /> ® S.R. 7 (U.S. 441); Broward County, FL, (2003-2004), South of Griffin Road to South of Stirling Road: Senior <br /> • Project Administrator for the roadway reconstruction and widening of a multi-lane divided section <br /> ® including drainage modifications/retention area construction, signalization, roadway lighting, landscaping <br /> • and irrigation,and pavement markings and signage. <br /> • N.W. 12th Street/HEFT Interchange: Miami-Dade County, FL, (2000-2001), connection with the <br /> ® Homestead Extension of Florida's Turnpike (HEFT): Senior Project Administrator for the intersection <br /> connection of the mainline HEFT to N.W. 12th Street (excluding toll booth buildings) including ramp <br /> • <br /> connections, two (2) flat slab bridges crossing Snapper Creek Canal, drainage improvements (including <br /> lake construction), concrete barrier wall, utility installations (water main, force main including aerial <br /> • crossings, and lift stations), signalization, roadway lighting, landscaping and irrigation, and pavement <br /> markings and signage. <br /> • <br /> • Palmetto Expressway (S.R. 826/N.W. 167th Street): Miami-Dade County, FL, (2000-2001), North of N.W. <br /> 154th Street to West of the Golden Glades Intersection: FDOT Senior Project Administrator for the milling <br /> ® <br /> and resurfacing of the mainline, ramps and adjacent frontage roads (N.W. 167th Street) and intersections <br /> • for three (3) concurrent/adjoining FDOT projects. The work involved included milling and resurfacing, <br /> ® concrete barrier wall modifications, signalization improvements/modifications, roadway lighting, <br /> overhead signage installation(s), pavement markings and signage, landscaping, bridge deck cleaning, and <br /> • utility adjustments. <br /> ® N.W. 40th Street: Coconut Creek, FL, (2006-2007), West of N. W. 54th Avenue to East of State Road 7 (U.S. <br /> • 441): Construction Administrator for the roadway widening and modifications of a divided section <br /> • including drainage modifications/improvements, intersection modifications, utility installations (water <br /> • main and sewer services), landscaping and irrigation, and pavement markings and signage. <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> ® Page 3116 <br /> 0 <br />