Laserfiche WebLink
® <br /> N:ft, � Calvin. Giordano & Associates, Inc. <br /> ! EXCEPTIONAL SOLUTIONS <br /> ® <br /> ® SABRINA BAGLII ERYgp <br /> ® Construction Support Services/Project Management <br /> ® SUMMARY OF QUALIFICATIONS <br /> 0 Ms. Baglieri has over 23 years civil engineering/construction management experience. <br /> ® She is an expert in the selection, setup, management, and control of roadway, parks and EDUCATION <br /> ® buildings projects: from the bidding processes to their completion and culmination. She B.S.Civil Engineering, <br /> is also experienced in the management practices of hurricane debris collection University of Florida, 1996 <br /> ® monitoring and data recording and with LAP compliance issues. Ms. Baglieri has <br /> ® working computer knowledge on operative systems such as DOS, Windows and the REGISTRATIONS <br /> following programs: Cadd2000, Excel, Microsoft Word, Timberline, Construction Link Florida Professional <br /> ® (CLI), Primavera, PowerPoint,and Quattro Pro for Windows. Engineer License No.: <br /> ® 56969 <br /> ® Ms. Baglieri has extensive experience and knowledge directly applicable to all types of Florida Certified General <br /> projects, relying on her background in engineering, construction and project Contractor License No. <br /> ® administration. Furthermore,she is well versed in the municipal processes necessary to 1511653 <br /> ® get work tasks completed on time, as well as she has demonstrated experience working <br /> ® within allocated budgets. These skills and aptitudes have all been exercised in her TRAINING AND <br /> capacity as Director of Capital Improvements for several local municipalities through CERTIFICATIONS: <br /> • Calvin, Giordano & Associates' various continuing services municipal contracts. The TIN:M620/25711660 <br /> ® breadth of her work has spanned all realms of implementation projects - from small <br /> residential-scale, community-scale, and urban scale. As such she has the necessary Asphalt Paving Level 1 <br /> ® knowledge in the management of the dynamics inherent in work scheduling, tasking, Earthwork Level 1 <br /> ® sequence matrices necessary to maintain continuity of work and fulfillment of the <br /> assessed milestones. These are important issues, especially when dealing with LAP Earthwork Level 2 <br /> ® funding, grants monies, bond assessments, and in both responding to the expressed Nuclear Surface Moisture <br /> ® needs of the community and to the management of complaints and issues in an Density Certification <br /> ® expedited manner <br /> OC Manager <br /> ® PROJECT EXPERIENCE IMSA-WZTC Safety <br /> ® City of Weston,Florida Projects Program <br /> ® • Vista Park: Advance MOT <br /> Boulevard: new roadway construction <br /> ® - Vista Park Development: Construction of 4 soccer fields, 4 softball fields, 2 WLTC Level 2-Traffic <br /> ® concession buildings, a maintenance building, and parking area. Provided Safety in the Work Zone <br /> lighting, lift station,water and sewer designs Erosion Control and <br /> ® • Traffic Signals for Weston Road/South Commerce Parkway Stormwater Management <br /> 5 • Tequesta Trace Concession Building Parking and Drainage <br /> ® • Bonaventure Master Plan Phase I, II, Ill and IV. Upgrade of all drainage, <br /> landscape,and roadway elements <br /> ® <br /> • Saddle Club Rd @ South Post Road Roundabout <br /> ® • Bonaventure Blvd. @ Blatt Road Roundabout <br /> ID • New traffic signals for Weston Road/North Corporate Lakes <br /> • FS 55 Emergency Signal <br /> 0 <br /> • Saddle Club/Arvida/Bonaventure overlay of roads and road/drainage <br /> ® improvements <br /> ® • Bonaventure/Racquet Signal <br /> • Regional Park/Parking Modification. Construction of Loop Road to connect <br /> ® existing parking lots <br /> ® Page 31 17 <br /> 0 <br />