Laserfiche WebLink
o <br /> • <br /> ® ; r�A 11 Calvin, Giordano & Associates, Inc. <br /> 1 E 3 C E P i ION A L SOLUTIONS <br /> • i <br /> • <br /> ® RODERICK MYRICK, PE <br /> ® Construction Observation/Inspection/Shop Drawing Review <br /> ® SUMMARY OF QUALIFICATIONS <br /> ® Mr. Myrick has 15+ years of transportation design-build, construction and emergency <br /> 5 response management experience in varying roles, his latest as responsible for business EDUCATION <br /> ® development and the management of a construction engineering and inspection B.S.Civil Engineering, <br /> division. He has demonstrated his diverse skills in several areas and is willing to make University of Florida, 1996 <br /> ® the tough management or technical decisions that are in the best interest of the client <br /> ® and his firm. Mr. Myrick has excellent communication and technical skills and will add REGISTRATIONS <br /> ® immeasurable value to any project or team. Florida Professional <br /> Engineer License No.: <br /> ® PROJECT EXPERIENCE 56969 <br /> ® Project Engineer- SR 90, US 41 Milling and Resurfacing, (12/2010 - 8/2011): The Florida Certified General <br /> project scope includes millings and resurfacing of a 4 mile stretch of US 41 in Collier Contractor License General <br /> ® County. This is a rural construction project which includes bridge traffic railing No. <br /> 1511653 <br /> Bmodifications, shoulder rework, asphalt, signalization, signing and pavement markings <br /> ® and guardrail retrofits. Roderick is currently managing 3 project concurrently on this TRAINING AND <br /> assigned, an additional mill and resurface project and a design build urban ADA CERTIFICATIONS: <br /> ® compliance project in the City of Naples. Reference: Eunice Usher, P.E. FMOC TIN:M620725711660 <br /> ® Operations In-House Construction Manager, (239) 656-7800 <br /> ® Senior Project Engineer- SR 5, US 1 Milling and Resurfacing, (11/2009 - 3/2010): Asphalt Paving Level 1 <br /> The project scope includes millings and resurfacing of a 2 mile stretch of US 1 in Palm Earthwork Level 1 <br /> ® Beach County. This is an urban construction project which includes minor widening, Earthwork Level 2 <br /> ® pavement repairs, drainage and pipe lining, signalization, signing and pavement <br /> markings and landscaping improvement. Reference: Jacques Beaubrun - WPB Nuclear Surface Moisture <br /> ® Operations Construction Manager, (561) 719-7912 Density Certification <br /> ® Senior Project Engineer- City of West Palm Beach, 24th and 25th Street, Streetscape DC Manager <br /> 0 Milling and Resurfacing, (11/2009 - 3/2010) The project scope includes millings and IMSA-WZTC Safety <br /> ® resurfacing, watermain installation, lighting and decorative streetscapes on this Program <br /> ® Federally funded Local Agency Participation project. This is an urban construction Advance MOT <br /> project which included major public involvement and coordination with the <br /> ® Department of Transportation. Reference: Brian Collins, PE 561.494.1040 Ext 2 WZTC Level 2-Traffic <br /> Safety in the Work Zone <br /> ® Senior Project Engineer- SR 7, US 441 Reconstruction, (8/2008 - 3/2010). The Erosion Control and <br /> ® project scope includes total reconstruction of the SR 7 corridor. This is a 25M urban Stormwater Management <br /> ® construction project which includes widening, milling and resurfacing, drainage, large <br /> retention facilities, lighting, signalization and landscaping improvement. Reference: <br /> ® Hassan Abedi, FTL Operations Construction Manager, (954) 958-7632 <br /> ® Senior Project Engineer- SR 15, US 441 Reconstruction, (12/2004 - 08/2007). The <br /> ® scope of this project included the reconstruction of the S-curve located along the SR 15 <br /> corridor in the City of Pahokee. Major items of work included: Community awareness <br /> ® initiatives for complete roadway closures; subsoil excavation; Geo-synthetic soil <br /> ® reinforcement (geo-grid); ARMI layer installation for the milling and resurfacing <br /> ® sections; major culvert replacements and rip-rap installations in conjunction with AB <br /> Mattress operations. Reference: Deb lhsan, WPB Construction Operations Manager <br /> ® (561) 432-4966 <br /> 5 Page 3119 <br />