Laserfiche WebLink
• <br /> fie j Calvin. Giordano & Associates. Inc. <br /> F i C F P i ION A l SOLUTIONS <br /> • <br /> • <br /> Roderick Myrick,PE, Page 2 <br /> • <br /> • Senior Project Engineer- Palm Beach County Signalization and Debris Management Coordinator, <br /> • (10/2005 - 02/2006). Mr. Myrick's duties included coordination with local jurisdictions for signalization, <br /> debris collection and damage assessment coordination. He was responsible for the oversight and contract <br /> • administration for signalized intersections restoration efforts in Broward and Palm Beach Counties. Mr. <br /> Myrick affectively managed signal restoration with 14 various signal contractors within the State of Florida. <br /> ® He served as the liaison between all maintaining agencies, various contractors, field personnel, local <br /> municipalities and other stakeholders affected by the Hurricanes that impacted this region. Mr. Myrick <br /> ® successfully completed all signal and debris restorations within the 180 day time frame for FHWA and <br /> • FEMA contracts Reference:Deb Ihsan, WPB Construction Operations Manager(561) 432-4966 <br /> • <br /> • <br /> • <br /> • <br /> 0 <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> 0 <br /> 0 <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • Page 3 1 20 <br /> • <br />