Laserfiche WebLink
• <br /> ® I Calvin, Giordano & Associates, Inc. <br /> • ,,. X C E P T I O N A L SOLUTIONS <br /> • <br /> • LIFT STATION No. 12 REHABILITATION <br /> • North Lauderdale, Florida <br /> • . . \ r ,�� i - - ;r rE 7%.' T. <br /> v, 'Q ' a C Client <br /> F j% M <br /> ® ,� - \ v City of North Lauderdale <br /> •-*/ '< Contact information <br /> 4. `• �;' r v ,k,\, at time of project: <br /> • • 1 � t` �tii ' ' ' Mike Shields <br /> �� x.- , t 4 Public Works Director <br /> ® ..? r 4 :r 701 SW 71'Ave <br /> ;\7' ' l . North Lauderdale, FL 33069 <br /> M. `1t <br /> ` l ^` ti` �` (954) 724-7039 <br /> k. � <br /> ® 't:.•. "N. ;. p t i 9 • \\ '`i. �!i Zi- I; <br /> Project Date <br /> • _ $ 4 : • \\ t• ''- 2008 <br /> • <br /> • A J t •, ��• Services Provided <br /> /.r <br /> • •`i'% \, • Civil Engineering <br /> YE.-. Principal in Charge <br /> ® Karl Kennedy, PE <br /> i.. <br /> ..,; <br /> • � _.< Project Manager <br /> .., :. _ _... ; .F . _�, George MKranager PE <br /> • <br /> • CGA Fees <br /> • $35,080 <br /> • Eng.Construction Est. <br /> • CGA conducted an investigation and survey of the existing lift station, and evaluated the $328,900 <br /> • mechanical, electrical, structural, and site aspects of the station. The design was to <br /> • convert existing City sanitary sewage Lift Station No. 12 from a "Suction Type" lift Initial Contract Cost <br /> station to a "submersible type" lift station. Work includes: demolition of the dry pit and $286,000 <br /> • existing piping, pumps and controls, rehabilitation of existing wet well, new valves and <br /> • piping, new valve vault, new pumps and controls,and site restoration. Change Orders <br /> • 0 <br /> • Final Construction Cost <br /> • 5286,000 <br /> •• <br /> • <br /> • <br /> • <br /> • 11 12-4942 SIB RD LS 12 Rehab_N Lauderdale Page 21 19 <br /> 0 <br />