Laserfiche WebLink
0 <br /> 0 <br /> e d Calvin, Giordano & Associates, Inc. <br /> 6 <br /> i. EXCEPTIONAL SOLUTIONS <br /> George Krawczyk, Page 2 <br /> Vista Park, City of Weston, Florida. Design Engineer assisting in construction management of city park <br /> project. The project included construction of new fields, drainage, water, sewer, restrooms, walkways, and <br /> shade pavilions. <br /> ® City of Dania Beach Water Main replacements, City of Dania beach, Florida. Design Engineer that <br /> managed the construction and permitting closeouts of various water mains throughout the City through <br /> • SRF funding. <br /> WATER AND SEWER DESIGN EXPERIENCE <br /> City of Dania Beach Directional Drill Project. Design Engineer that managed the design and <br /> ® construction of(2) 12" directional drills for water main transmission. He completed the permitting for BC <br /> ROW, SFWMD ROW, and BCHD with closeouts. <br /> 0 City of Plantation Directional Drill Project. Design Engineer that managed survey work and field <br /> O investigations, designed three (3) directional drills - 30 FM, 10 WM, and 8 WM. He completed the <br /> ® permitting for FDOT, SFWMD, ROW, BCHD, and BCEPD Transmission. <br /> 0Gulfstream Park Project Phase I, Hallandale Beach, Florida. Design Engineer that worked on the <br /> 0 design, permitting, and construction inspection of an AirVac Vacuum sewer system, force main,water main, <br /> expansion of the horse grass track to 170' wide, drainage, and rehabilitation of existing gravity sewer <br /> O system. <br /> ® Town of Davie Water and Sewer Master Plan,Town of Davie, Florida. Project Engineer responsible for <br /> review and study of the water and sewer network. The report recommended many utility upgrades and <br /> 0 analysis in future development areas. <br /> Town of Davie Lift Station #8 Town of Davie, Florida. Project Engineer responsible for review, design, <br /> O and coordination of a master pump station. He completed the permitting for BC, FDOT and, BCEPD. <br /> Hollywood 300 Avenue Force Main Project, City of Hollywood, Florida. Project Manager responsible <br /> 0 for the design and construction of a force main, lift station,and gravity sewer system. <br /> ® Town of Davie Wastewater Pretreatment Program, Town of Davie, Florida. Project Engineer <br /> responsible for management of Town's Pretreatment Program. The tasks included site inspections, <br /> 0 laboratory coordination, regulatory reviews, Industrial User Permits, FDEP inspections, and FDEP <br /> 0 responses. <br /> 0 Saint George West Portion of Broward County, Central Neighborhood Improvement Project, Florida. <br /> ® Design engineer responsible for design and permitting of the sanitary sewer system. Completed the <br /> 0 permitting for surface water, sewer transmissions, biological resource, and FDOT "general use" permit <br /> from governing policies. He also verified quantities and print reproduction for the project which equaled 7 <br /> ® million. <br /> DRAINAGE DESIGN EXPERIENCE <br /> 0 City of Weston Pump Station 2, Field engineer supervising the repair and upgrade of (2) storm water <br /> pumps through grant funding. <br /> O NE 122nd Street Neighborhood Improvement Project, City of North Miami Beach, Florida. Project <br /> ® Engineer that was responsible for the design and permitting for construction of drainage, parking, and <br /> ® roadway reconstruction to meet the needs of residents. <br /> ® Page 31 19 <br />