|
®
<br /> EA 1 Calvin, Giordano 8 Associates, Inc.
<br /> 4 EXCEPTIONAL SOLUTIONS
<br /> ® Y,
<br /> ® DAVID STAMBAUGH, PE
<br /> ® Sanitary Sewer& Water Distribution, Regulatory Compliance
<br /> ® SUMMARY OF QUALIFICATIONS
<br /> O With more than seven years of construction experience followed by six years of design EDUCATION
<br /> O and project management Mr. Stambaugh has developed a strong understanding of the
<br /> ® engineering profession. Experienced in the design of public and private engineering Bachelor of Science
<br /> projects, such as expansion of water and wastewater treatment plants, design of sewage in Civil Engineer,
<br /> ® collection and transmission systems, water distribution systems, surface water University of Central
<br /> ® management systems, roadways, and parking lots. Florida, 2000
<br /> ® PROJECT EXPERIENCE PROFESSIONAL
<br /> ® WATER AND WASTEWATER DESIGN REGISTRATIONS
<br /> ® Alternative Water Supply Pilot Study Program, Pembroke Pines, FL; Assisted with Professional Engineer
<br /> the selection of advanced wastewater treatment plant processes suitable for State of Florida,
<br /> ® groundwater recharge and creation of the pilot test program. Managed overall pilot No. 70757
<br /> ® operations which included equipment delivery, start up, operation, and collection of CERTIFICATIONS
<br /> samples for laboratory analysis.
<br /> ® Oakland Park Bid Pack 9 Neighborhood Improvements, Oalland Park, Florida Bid FEMA Introduction to
<br /> 0 Pack 9 is approximately 570 acres and located in the northeast corner of the City, east of the Incidental Command
<br /> ® Dixie Highway and north of NE 38th Street to the City limits. The major components of System,ICS 100
<br /> ® this project include; water main replacements, pavement restoration, force main MEMBERSHIPS
<br /> replacement Lift Stations B-2, B-3,& B-4 rehabilitation, and drainage improvements
<br /> ® Florida Engineering Society
<br /> O Wastewater Treatment Plant Expansion Phase IV, Davie, FL; Assisted with the (FES) of Broward County,
<br /> design of plans and specifications for the addition of a package treatment unit and Florida
<br /> ® associated equipment for the expansion of the wastewater treatment plant. American Society of
<br /> ® Civil Engineers (ASCE)
<br /> ® Water Treatment Plant Improvements Phase II, Pembroke Pines, FL; Coordinated
<br /> equipment start up for an upflow treatment unit lime slaker, multi media filter, ion COMPUTER SKILLS
<br /> O exchange color removal system, and sodium hypochlorite disinfection system. Designed Microsoft Office
<br /> ® a carbon dioxide storage and feed system. Prepared as built drawings, project closeout AutoCAD
<br /> ® documents and certification of construction completion packages to governmental Pump Selection Software
<br /> permit agencies. Cascade
<br /> ® Northshore Improvements, Miami Beach, Florida The project is located in the City of
<br /> ® Miami Beach, in Miami-Dade County and consists of approximately 22,000 linear feet of
<br /> ® roadway, swales, and sidewalks extending North Shore Neighborhood of Miami Beach.
<br /> By means of a Special Assessment, the completed project will service with new water
<br /> O mains, sanitary sewer, and under grounding of electrical power, cable television, and
<br /> ® telephone. In addition, drainage improvements including curb & gutter, retention areas,
<br /> ® pollution retardant devices, and storm water collection system
<br /> ® Water Treatment Plant Risk Management Plan, Pembroke Pines, FL; Assisted with
<br /> ® the preparation of a Risk Management Plan to prevent and minimize the impact of an
<br /> accidental release of chlorine. Provided training for operations personnel on the
<br /> ®
<br /> standard operating procedures. Prepared submittal to the United States Environmental
<br /> ® Protection Agency for compliance with 40 CFR Part 68 Chemical Accident Prevention
<br /> ® Provisions.
<br /> 0
<br /> 0 Page 31 20
<br />
|