My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano - Environmental Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Calvin Giordano
>
Calvin Giordano - Environmental Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 11:06:17 AM
Creation date
2/2/2016 11:06:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> ® `e Calvin, Giordano 5 Associates, Inc. <br /> CI EXCEPTIONAL SOLUTIONS <br /> • <br /> ® Mohammed Sharifuzzaman, PE, Page 2 <br /> • Willoughby Boulevard Extension, Martin County, FL; Completed surface water management system <br /> • design per SFWMD, FDOT, Martin County design criteria, Stormwater Management Report/Calculations, <br /> Pre/Post ICPR Modeling, SFWMD ERP permitting, Dewatering Permitting, Pre-development Basin Map, <br /> • Post-development Basin Map for Poppleton Creek Watershed. The project scope included replacement of <br /> • existing creek by twin 72" storm pipes and expansion of an existing FDOT pond to accommodate the <br /> ® proposed Willoughby Boulevard extension project. <br /> • Holy Cross Catholic Church, Martin County, FL; Designed the master surface water management system <br /> • for the proposed and existing church facilities (19.99 acres), developed ICPR model, Stormwater <br /> management Report, Stormwater Calculations, and Construction plans, performed Nutrient Loading <br /> ® Analysis (TMDL Calculations) for SFWMD permitting. The drainage system included the onsite wetland <br /> ® along with onsite wet detention and dry retention areas. <br /> • Martin Memorial Hospital North, Stuart, FL; Developed the master basin map identifying existing <br /> • stormwater management systems, and outfall locations, determined existing level of service, made <br /> • recommendation for proposed improvements. Designed flood protection improvement for sub-basin 'F' for <br /> the 100-year design storm event, including pump station upgrade and conveyance system improvement. <br /> • <br /> • Johnson Honda of Stuart, Stuart, FL; Completed the design and permitting for the surface water <br /> ® management system consisting of exfiltration trench, dry detention areas, and CULTEC underground <br /> retention system. Developed ICPR model, Stormwater Management Report/ calculations, and the <br /> ® Construction plans for the project. <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> 0 <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • Page 31 23 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.