My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano - Environmental Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Calvin Giordano
>
Calvin Giordano - Environmental Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 11:06:17 AM
Creation date
2/2/2016 11:06:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 0 <br /> eta Calvin, Giordano & Associates, Inc. <br /> rZ E % C E P TIONAL i 0 L U i 1 O N i <br /> • <br /> • <br /> • DOUGLAS TAYLOR, PE <br /> • Stormwater Master Planning, Drainage Design <br /> O SUMMARY OF QUALIFICATIONS <br /> • Mr. Taylor has been responsible for a multitude of municipal engineering and EDUCATION <br /> ® development projects throughout Florida. This includes project management, master <br /> design responsibility and oversight for a variety of projects. BS Civil Engineering <br /> ® University of Illinois 1984 <br /> ® During his 28 years of experience, Mr.Taylor has performed numerous drainage studies, <br /> designed many storm water management systems, designed tens of miles of roads, PROFESSIONAL <br /> o watermain, sanitary, and storm sewers, along with thousands of acres of grading, and REGISTRATION <br /> ® drainage on municipal, commercial, institutional, recreational, and industrial projects in Florida PE No.50569 <br /> • Florida,and the Caribbean. <br /> CERTIFICATIONS <br /> O SAMPLE PROJECT EXPERIENCE <br /> • City of Oakland Park, Kimberly Lake Flood Mitigation and Water Quality FEMA ICS-100 Certification <br /> Enhancement Project., Oakland Park, FL; Project Director. Built out in the late FEMA ICS-200 Certification <br /> 1970s, the 72 acre Kimberly Lake drainage basin had been an area prone to extreme <br /> • flooding for a number of years. The City of Oakland Park staff wished to develop PROFESSIONAL <br /> • alternate solutions to mitigate the flooding issues and present those to the City ASSOCIATIONS <br /> ® Commission.. Directed surveying, engineering, consensus building, liaison with Urban Land Institute Intl. <br /> governmental agencies, and construction related services on the project. The Council of Shopping <br /> ® performance of the designed improvements has met the City's expectations. Centers <br /> ® Hallandale Beach NE Quadrant Drainage Study & Improvements, Hallandale <br /> ® Beach, FL, Project Manager. There are a number of drainage facilities within the 200 <br /> ® plus acre project area with limited conveyance capacity and high head loss. Using ICPR, <br /> ® CGA modeled a proposed system of two pump stations connected to sixteen wells while <br /> maintaining the existing gravity wells and gravity outfall. These sixteen new wells will <br /> ® be pressurized with fifteen (15) feet of head in order to produce the necessary discharge <br /> • into the G3 aquifer. FDEP and the Broward County Environmental Resource Department <br /> ® and FDEP have permitted the project. <br /> ® Indian Trace Community Development District, Weston, FL. Mr. Taylor works on <br /> e various design projects and "troubleshoots" issues related to the District. The Indian <br /> Trace Development District (ITCDD), a dependent district of the City of Weston, consists <br /> ® of 2,245 acres of interconnected lakes and wetlands discharging into the South Florida <br /> ® Water Management District (SFWMD) C-11 West Canal. The water quality and discharge <br /> rates are controlled by the two large Stormwater pump stations on the southern <br /> 0 boundary of the community. . <br /> College Avenue Improvements, Davie, FL - Project Manager. Design and permitting <br /> ® Of .60 miles of improvements for the Town of Davie including taking a two lane rural <br /> ® section with drainage to a four lane urban section with bike lanes, curbing, median, <br /> ® sidewalk, a new drainage system. lighting„ landscaping, and irrigation. The project was <br /> permitted through Central Broward Water Control District (CBWCD), South Florida <br /> ® Water Management District (SFWMD), and Broward County Highway Construction and <br /> ® Engineering Division. <br /> 40 <br /> 410 Page 31 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.