My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano - Environmental Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Calvin Giordano
>
Calvin Giordano - Environmental Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 11:06:17 AM
Creation date
2/2/2016 11:06:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> , -1 Calvin. Giordano & Associates. Inc. <br /> p��\\�1�. E X C E P i I 0 N A L 5 0 L U i I 0 N 5 <br /> • 1 <br /> • Douglas Taylor, PE, Page 2 <br /> • Griffin Road, FL; Project Manager, Engineer of Record. Included in this project was the milling and <br /> • resurfacing of two miles of highway and the addition of two lanes of new roadway to create a four lane <br /> section. This involved the addition of drainage improvements and water quality improvements. <br /> • <br /> • NW 38th Street Improvements, Oakland Park, FL - Project Manager- Mr. Taylor managed the <br /> engineering design services for a section of roadway located west of I-95. The design included paving,base, <br /> sub-base, drainage and other utilities. This was an existing 40 year old roadway which was originally <br /> • designed without consideration of the drainage of areas adjacent to the roadway. This was corrected with <br /> • the reconstruction. <br /> • Bonaventure Development District (BDD), Weston, FL. Mr. Taylor works on various design projects and <br /> • "troubleshoots" issues related to the District. The Bonaventure Development District (BDD), formerly <br /> known as West Lauderdale Water Control District,was first developed in the early 1970's and annexed into <br /> ® <br /> the City of Weston in 1997 and encompasses 1,237 acres, to include residential, a major hotel/conference <br /> • facility,two golf courses and a limited number of commercial properties. <br /> • The District's storm water management system consists of canals and lakes interconnected discharging <br /> • into the South Florida Water Management District (SFWMD) North New River Canal (NNRC). The water <br /> • quality and discharge rates are permitted to be controlled by two storm water pump stations on the <br /> northern boundary of the community. Construction of the principal Drainage Facilities began in 1970 and <br /> • <br /> was completed in 1974. <br /> • NW 12th Street Improvements, Oakland Park, FL- Project Manager. Within the CRA redevelopment <br /> area, this narrow roadway did not meet the standards required to create an environment conducive to <br /> • positive economic development of the area.This included widening, on street parking,and the introduction <br /> • of new landscape and hardscape elements. Services provided included the planning, design, and permitting <br /> ® of roadway,drainage, utility relocation, pavement marking and striping improvements. <br /> • Cougar Lane, Coconut Creek, FL-Project Manager. Cougar Lane, adjacent to Coconut Creek High School, <br /> • was a roadway nearing the end of its intended useful design life that was experiencing drainage problems. <br /> Services provided included the design, permitting, and construction services for milling and resurfacing of <br /> • the roadway, utility relocation, and drainage retrofit for one half mile of existing roadway. <br /> • Manatee Isles Drive Roadway Project, Weston, FL, Project Engineer. This project for the City of <br /> • Weston, was designed to widen and provide drainage improvements on Manatee Isles Drive between SW <br /> • 196th Avenue and South Post Road. The project also included milling and resurfacing, median work, <br /> ® installation of curb and gutter, signing and marking upgrades,and a Maintenance of Traffic plan, in addition <br /> to proposed electrical, landscape and irrigation work. <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • Page 31 25 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.