Laserfiche WebLink
® <br /> '�'n . 1 Calvin, Giordano & Associates, Inc. <br /> 4 k E X C E P T I O R A L S O L U E I 0 % S <br /> ® } <br /> ® James E.Spinks, PE, PTOE,Page 4 <br /> ® Districtwide Corridor Planning Studies, FDOT District VI Planning Office, Miami, Florida. Mr. Spinks <br /> ® provided on-site consultant services for developed planning and engineering products for numerous <br /> Program activities, PD&E studies and PLEMO studies of the Planning Office Corridors Team. He served as <br /> ® FDOT representative with the maintenance and development of improvements along the Florida Keys <br /> ® Heritage Trail in cooperation with Monroe County officials and various city representatives within Monroe <br /> County. <br /> ® SR-968/Flagler Street from SR-826 to SR-969/Milam Dairy Road, Arterial Analysis, Miami, Florida. <br /> ® Mr. Spinks served as Project Engineer for this study conducted for the FDOT District VI Traffic Operations <br /> ® Office which identified improvements for this urban corridor. The study included analyzing Department <br /> crash data, performing traffic operational analysis, developing alternative improvements compliant with <br /> ® current access management standards and guidelines to reduce crash patterns, and performing <br /> benefit/cost analysis of each alternative. <br /> ® SR-916/Opa-locka Boulevard at NW 2 Avenue, Intersection Analysis, Miami, Florida. Mr. Spinks <br /> ® served as Project Engineer for this study conducted for the FDOT District VI Traffic Operations Office which <br /> identified improvements for this intersection. The study included data collection, analyzing Department <br /> 0 <br /> crash data, identifying crash patterns, performing traffic operational analysis, developing alternative <br /> ® improvements to reduce crash patterns, and performing benefit/cost analysis of each alternative. <br /> ® Districtwide Safety Contract, FDOT District Four Traffic Operations Office, Ft. Lauderdale, Florida. <br /> Mr. Spinks performed multiple traffic engineering studies including Qualitative Assessments, Intersection <br /> Analysis, Left Turn Warrants, Signal Warrants, Arterial Analysis, Corridor Evaluations, Travel Time and <br /> Delay Studies. <br /> ® Palm Beach County Traffic Division. Mr. Spinks was responsible for countywide signalization of new <br /> ® intersections,designing new intersections,and modifying existing intersections. He supervised Engineering <br /> Assistants and CADD Technicians. He participated in design, construction, modification, and maintenance <br /> ® related activities of existing and future roadway intersections. <br /> ERM Technologies, Inc.,St. Louis, MO (2/1999-1/2000), Project Engineer I.As Owner's representative <br /> for project management and contract coordination of multiple projects totaling over $5 million, Mr. Spinks <br /> ® oversaw construction including interceptor/outfall structures and pipe installations for MSD. He was also <br /> responsible for contract documentation, project scheduling, and job progress meetings. <br /> ® U.S. Army Corps of Engineers, St. Louis District, St. Louis, MO - Student Intern (5/1994-11/1998). <br /> ® Mr. Spinks oversaw project sites for several construction sites representing the U.S. Army Corps of <br /> Engineers as a Quality Assurance Representative with project amounts exceeding $3 million. Projects <br /> ® included the construction of a pump station, multiple gate well structures, over 4 miles of levee and Lock <br /> ® and Dam No. 26 - I-Wall Removal. <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> ® Page 31 33 <br />