Laserfiche WebLink
S <br /> ® � , 1 Calvin, Giordano & Associates, Inc. <br /> 't ' EXCEPTIONAL SOLUTIONS <br /> ® ^A�Ci <br /> James E.Spinks, PE, PTOE,Page 3 <br /> ® Districtwide Safety Contract, FDOT District Six Traffic Operations Office, Miami-Dade & Monroe <br /> S Counties, Florida. Mr. Spinks performed multiple traffic engineering studies including: Qualitative <br /> Assessments, Intersection Analysis, Left Turn Warrants, Signal Warrants, Arterial Analysis, Corridor <br /> ® Evaluations,Travel Time and Delay Studies. <br /> ® General Planning Consultant - Systems, Calvin, Giordano & Associates, Inc. / FDOT District Four, <br /> ® Districtwide, Florida. Mr. Spinks served as a transportation planner on this on-call services consultant <br /> ® contract. Assignments include project traffic forecasts (travel demand), GIS support, and miscellaneous on- <br /> e site planning support services. <br /> ® Districtwide ITS Technical Consultant, VHB, Inc./FDOT District VI, Miami-Dade & Monroe Counties, <br /> S Florida. Mr. Spinks served as a project engineer on this on-call services consultant contract. Assignments <br /> ® include formation of a regional ITS coalition, development of a regional database and GIS mapping of <br /> current and planned ITS deployment in the Palm Beach, Broward, Miami-Dade and Monroe Counties. <br /> S <br /> S <br /> SR-5/US-1 at SW 32 Avenue Intersection Analysis, FDOT District VI, Miami, Florida. Mr. Spinks served <br /> as Project Engineer for this study for the Traffic Operations Office. This study performed an assessment of <br /> S traffic operations and safety at the signalized intersection including a left turn warrant analysis and <br /> ® queuing analysis. This study was a result of a citizen request to include a left-turn protected phase for the <br /> SW 32 Avenue approaches to alleviate significant delays experienced by the left turning vehicles from that <br /> • street. This study included field observations, crash review, delay studies, traffic data collection and <br /> S development of condition and collision diagrams. <br /> S SW 8 Street from SW 137 Avenue to SW 127tAvenue Traffic Control Plan (TCP) Traffic Analysis, <br /> S FDOT District VI, Miami, Florida. Mr. Spinks was the Project Engineer for this study conducted for the <br /> ® Traffic Operations Office which involved an operational analysis and review of the traffic control plan. He <br /> S performed traffic analysis to evaluate the existing TCP and tested modified TCP options for the SW 8 Street <br /> construction zone. He used Synchro/SimTraffic micro-simulation so that the visual animation output could <br /> IS be presented to the public. This study involved field review, traffic data collection, travel time and delay <br /> S studies, performing traffic operational analysis, and developing options. <br /> • SR-826/NW 154 Street Interchange Area Traffic Study, FDOT District VI, Miami Lakes, Florida. Mr. <br /> S Spinks was the Project Engineer for the traffic operations study for one of the most congested interchange <br /> S areas in Miami-Dade County. This study involved field observations, traffic data collection, traffic <br /> operational analysis, development and evaluation of improvement alternatives, preliminary engineering, <br /> S preliminary cost estimates, trip generation, micro-simulation and operational benefit-cost analysis were <br /> S performed as part of the study. Performed a traffic operational analysis to evaluate existing and proposed <br /> conditions for SR-826/NW 154 Street interchange. The improvement concept, estimated at $4 million, <br /> • <br /> includes the addition of turn lanes, widening of NW 154 Street, NW 77 Court, and the SR-826 southbound <br /> S on-ramp. Through micro-simulation analysis, the proposed improvements were found to reduce the <br /> average delay per vehicle by as much as 48 percent during the peak hours. <br /> ® HEFT/SR-874 Project Development and Environment (PD&E) Study from US-1/Government Center <br /> S to SR-874, Florida's Turnpike Enterprise, Miami-Dade County, Florida. As Task Engineer, Mr. Spinks <br /> assisted in the evaluation for this six and one-half mile PD&E study through the most heavily traveled <br /> • <br /> segment of Florida's Turnpike. This project examined widening the HEFT and modifying the SR-874 <br /> S interchange to address capacity and operational safety needs. Task assignee on activities related to PER, <br /> S SEIR, and public hearings. <br /> • <br /> • Page 31 32 <br /> S <br />