My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Chen Moore
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:00:52 PM
Creation date
2/2/2016 1:41:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> ® CHENMOORE <br /> ® i issocs <br /> ® Ben H Chen, PhD, PE, BCEE <br /> • Chairman and Founder <br /> U <br /> ® Education and South District Wastewater Treatment <br /> Bachelor of Science, Civil Engineering, Plant. This force main is for the disposal of <br /> W National Taiwan University, 1967 the reject water from the membrane water <br /> • Master of Science, Sanitary Engineering, treatment units currently under construction <br /> a. National Taiwan University, 1969 at the water plant. Major cost saving ideas <br /> W Doctor of Philosophy, Civil Engineering, proposed included: Twin 42" directional <br /> ® Virginia Polytechnic Institute and State drilled HDPE pipe under the Turnpike and C-1 <br /> ® University, 1973 Canal instead of the single 60" micro- <br /> tunneling DIP crossing; shallowing and open <br /> ® Registration cut across US-1 instead of deeper micro- <br /> Professional Engineer, Florida, 31849, 1982 tunneling; narrowing the size and reducing <br /> ® Professional Engineer, Virginia, 008803, 1976 the number of isolation plug valves; and <br /> ® modifying the 24" outlets. The VE report also <br /> ® Professional Affiliations increased the allowance for the trench <br /> • American Academy of Environmental overcut, sheeting, flowable fill, and <br /> ® Engineers dewatering. Despite these cost increases, an <br /> ® • American Society of Civil Engineers overall $1.6 million in cost savings were <br /> • American Water Works Association realized. <br /> ® • Florida Engineering Society <br /> ® • National Society of Professional Marathon MS4 Permit & Stormwater <br /> Engineers Utility Fee. Chen Moore and Associates <br /> ® contracted with City of Marathon for the <br /> ® <br /> Summary preparation of: <br /> Dr. Chen has over 44 years of civil and • Stormwater Utility Fee and Ordinance <br /> ® environmental engineering experience. His • Roadway/Drainage Inventory Map, and <br /> ® experience includes urban infrastructure • MS4 Notice of Intent <br /> renewal, water and wastewater treatment Dr. Chen was responsible for the Stormwater <br /> ® facilities design and construction Utility Fee of the project. The process <br /> ® management, facilities planning, included a large GIS component. The <br /> environmental studies, utilities master impervious area of a sample set of residential <br /> 0 planning, rate and financial studies. He is parcels was digitized using aerial <br /> ® principal-in-charge for the Central Broward interpretation in GIS. An Equivalent <br /> County and Broadview Park Neighborhood Residential Unit (ERU) analysis was <br /> 0 Improvement Projects for Broward County completed by calculating the average <br /> ® and project director for City Center and South impervious area per residential parcel. The <br /> Pointe Right of Way Infrastructure impervious area for each non-residential lot <br /> ® Improvement Projects for Miami Beach. was digitized and the number of ERUs was <br /> assigned. The total fee was established by <br /> ® Project Experience analyzing the anticipated yearly public works <br /> ® Miami Dade WASD VE Study - 60" Force program by the City. A weighted Stormwater <br /> ® Main. Chen Moore and Associates was Utility Fee was determined for each parcel <br /> retained by the Miami-Dade Water and Sewer based on ERUs. The list of parcels with fees <br /> ® Department to perform a value engineering was submitted to the tax authority. Dr. Chen <br /> ® study for the 60" force main between the then prepared the Stormwater Utility <br /> ® South Miami Heights Water Treatment Plant Ordinance for the City, including the fees for <br /> ® RFQ# 12-04-02 <br /> Continuing Professional Architectural & Engineering Services Firms Only (CCNA) <br /> ® www.chenmoore.com <br /> ® 3-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.