My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Chen Moore
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:00:52 PM
Creation date
2/2/2016 1:41:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> • 10111 <br /> ® CHENMOORE <br /> ® &ASSOCIATES <br /> • different types of land uses and assisted the Avenue included the conversion of an existing <br /> • City by explaining the processes and outcome bidirectional roadway into a one-way roadway <br /> ® to the City Commission at meetings. Chen and the construction of new sidewalk, curb <br /> Moore and Associates continues to do yearly and gutter, and a parallel parking lane along <br /> • re-assessments of the tax roll to account for the west side of the roadway. <br /> ® changes in property ownership, new <br /> ® developments and appeals by residents. North Miami Beach NE 162nd Street <br /> Improvements. Chen Moore and Associates <br /> 0 Miami Beach City Center Right of Way was selected as one of the consultants to <br /> Improvement Project. Chen Moore and participate in the Proud Neighborhoods <br /> ® Associates is the prime consultant and was Capital Improvement Project for the City of <br /> ® responsible for providing surveying, planning, North Miami Beach. To date, Chen Moore and <br /> ® geotechnical investigation, design, permitting, Associates has completed four right of way <br /> preparation of construction documents, bid improvements projects within the City. Each <br /> ® and award and construction engineering and of these areas has included roadway and <br /> inspection services for infrastructure drainage improvements along with additional <br /> IP improvements within the public right of way hardscape and landscape elements. This <br /> 9 areas of the City Center neighborhood of project includes right of way improvements to <br /> Miami Beach. The project encompasses NE 162nd Street between NE 17th Avenue <br /> ® approximately 24,000 LF of ROW and NE 18th Avenue adjacent to Allen Park. <br /> ® infrastructure improvements including water <br /> main replacements, sanitary sewer upgrades, North Miami Beach NE 173rd Street Right <br /> ® stormwater drainage improvements, paving & of Way Improvements. Chen Moore and <br /> ® grading, streetscaping enhancements, Associates prepared right-of-way <br /> ® landscaping improvements, lighting improvement plans for NE 173rd Street from <br /> improvements, and roadway reconstruction. West Dixie Highway to NE 23rd Avenue within <br /> ® This project also required extensive an existing residential community. The design <br /> ® <br /> coordination with the Public, adjacent CRAs, included stormwater improvements, <br /> historic districts and various regulatory formalizing of onstreet parking, <br /> ® agencies. traffic/roadway modifications, sidewalks with <br /> ADA grading considerations and preserving <br /> ® Pinecrest SW 79th Avenue Roadway and incorporating existing trees and resident <br /> • Improvements. Chen Moore and Associates requests. This project also included the <br /> ® provided professional engineering services for design of a traffic circle to provide traffic <br /> the planning, design, and permitting of the calming as well as streetscape beautification <br /> ® roadway improvements to SW 79th Avenue with a stamped concrete apron and <br /> ® and SW 112th Street, including the landscaping. The design plans were <br /> reconfiguration of SW 79th Avenue between permitted via the City of North Miami Beach, <br /> • SW 110th Street and SW 112th Street, the Miami-Dade County Department of <br /> ® construction of a right turn lane extension Environmental Resources Management and <br /> from SW 112th Street onto US-1, and the Miami-Dade County Public Works Traffic <br /> • construction of drainage improvements to Engineering Department. Services included <br /> • alleviate flooding concerns along the project design, permitting, bidding assistance and <br /> roadways. The reconfiguration of SW 79th limited construction administration services. <br /> 40 <br /> • RFQ# 12-04-02 <br /> ® Continuing Professional Architectural & Engineering Services Firms Only (CCNA) <br /> • www.chenmoore.com <br /> ® 3-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.