Laserfiche WebLink
o <br /> ® CHENM00RE <br /> ® &ASSOCIATES <br /> ® the membrane water treatment units currently fixtures, and designing additional landscaping. <br /> ® under construction at the water plant. Major Chen Moore and Associates is tasked to gain all <br /> cost saving ideas proposed included: Twin 42" necessary permit approvals to move forward <br /> directional drilled HDPE pipe under the Turnpike with construction documents as well as <br /> • and C-1 Canal instead of the single 60" micro- coordinate with FP&L for the undergrounding of <br /> O tunneling DIP crossing; shallowing and open cut overhead wires. <br /> across US-1 instead of deeper micro-tunneling; <br /> ® narrowing the size and reducing the number of North Miami Beach NE 168th Street <br /> ® isolation plug valves; and modifying the 24" Roadway Improvements. Chen Moore and <br /> outlets. The VE report also increased the Associates provided consulting engineering <br /> W allowance for the trench overcut, sheeting, services for the NE 168 Street (between NE 18 <br /> ® flowable fill, and dewatering. Despite these Avenue and NE 19 Avenue) and NE 18 Avenue <br /> cost increases, an overall $1.6 million in cost (between NE 168 Street and NE 169 Street) <br /> W savings were realized. right of way improvements. The scope of the <br /> ® project included addressing drainage concerns, <br /> Miami Beach Sunset Islands 1 & 2 providing new curbing and street paving, <br /> W Right-of-Way Improvements. Chen Moore replacing/adding sidewalks, providing new <br /> ® and Associates designed stormwater, water paved parking areas which were gravel, and <br /> main, and roadway improvements for the City providing landscaping areas for future plantings <br /> ® of Miami Beach. to be completed by the City. <br /> • <br /> Fort Lauderdale South Beach Parking Lot Miami Gardens NW 38th Ct Drainage <br /> ® Wall Replacement and ADA Improvements. Improvements. Chen Moore and Associates is <br /> ® Chen Moore Associates was asked to provide designing stormwater improvements for NW <br /> the restoration and enhancement of the City- 38th Avenue to NW 38th Place & NW 208th <br /> ® owned 6.5 acres "South Beach" parking lot, Street to NW 209th Street. <br /> ® located along SR AlA, south of Las Olas <br /> ® Boulevard. The scope of work includes bringing Pinecrest SW 64th Ct Drainage <br /> the parking lot into ADA compliance per Improvements. Chen Moore and <br /> ® requirement of the consent decree, replacing a Associates assisted with drainage improvements <br /> ® <br /> deteriorating low profile wall and sidewalk for SW 64th Ct. As part of the project, Chen <br /> approximately 2100 feet in length, designing for Moore and Associates provided construction <br /> ® easier vehicle and pedestrian ingress/egress, documents, permit applications, a final <br /> ® replacing existing lighting with turtle-compliant construction plan set & cost estimate. <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> ® RFQ# 12-04-02 <br /> Continuing Professional Architectural & Engineering Services Firms Only (CCNA) <br /> • <br /> • www.chenmoore.com <br /> ® 3-9 <br />