|
0
<br /> 0
<br /> ® CHENM00RE
<br /> ® sissocaus
<br /> 0
<br /> • Jose Luis Acosta, PE
<br /> ® Project Manager
<br /> O Education Sunny Isles Beach. The site is located at
<br /> O Masters of Business Administration, Master of 18115 North Bay Road. The project included
<br /> Business Administration, Auburn University, full design services for the city orchestrating
<br /> • 2003 park planning, paving, grading, drainage,
<br /> O Bachelor of Science, Civil Engineering, water, sewer, irrigation, landscape
<br /> University of Miami, 1999 architecture, architectural design,
<br /> • Bachelor of Science, Architectural government permitting and construction
<br /> ® Engineering, University of Miami, 1999 administration services on a limited site. The
<br /> project included off-site drainage
<br /> 0 Registration improvements and coordination with adjacent
<br /> O Professional Engineer, Florida, 63827, 2004 projects in construction. Amenities of the
<br /> Natl. Council of Examiners for Eng. & park include the following: baseball field;
<br /> 0 Surveying, 41987 recreation building and gym with a
<br /> • multipurpose court; playground area and
<br /> 11.
<br /> Professional Affiliations structure. This project represents Mr. Acosta's
<br /> • American Society of Civil Engineers experience while employed with another firm.
<br /> O • Cuban American Association of Civil
<br /> O Engineers Miami Beach City Center Right-of-Way
<br /> • Florida Engineering Society Improvement Project. Chen Moore and
<br /> • • National Society of Professional Associates is the prime consultant and was
<br /> O Engineers responsible for providing surveying, planning,
<br /> • Society of Military Engineers geotechnical investigation, design, permitting,
<br /> 0 • Urban Land Institute preparation of construction documents, bid
<br /> and award and construction engineering and
<br /> O Certifications inspection services for infrastructure
<br /> • Stormwater Management Inspector improvements within the public right of way
<br /> areas of the City Center neighborhood of
<br /> 0 Summary Miami Beach. The project encompasses
<br /> O Jose Acosta, P.E. is a project manager and approximately 24,000 LF of ROW
<br /> O
<br /> leads Chen Moore and Associates' Miami infrastructure improvements including water
<br /> office. Mr. Acosta has over 12 years of main replacements, sanitary sewer upgrades,
<br /> O experience directing and performing the stormwater drainage improvements, paving &
<br /> design of site civil engineering plans/tasks, grading, streetscaping enhancements,
<br /> 0 including paving, drainage, water, landscaping improvements, lighting
<br /> O wastewater, roadway, and signing and improvements, and roadway reconstruction.
<br /> O marking for several municipalities throughout This project also required extensive
<br /> Miami-Dade, Broward and Palm Beach coordination with the Public, adjacent CRAs,
<br /> O Counties. historic districts and various regulatory
<br /> agencies.
<br /> ® Project Experience
<br /> O Sunny Isles Beach Active Park (Pelican Pinecrest SW 60th Avenue Sidewalk.
<br /> O Community Park). The 2.5-acre active park Chen Moore and Associates prepared sidewalk
<br /> site design was designed to become the expansion plans for over 2 /2 miles of
<br /> O premier recreational park for the City of sidewalk within an existing wooded estate
<br /> 0
<br /> O RFQ# 12-04-02
<br /> ® Continuing Professional Architectural & Engineering Services Firms Only (CCNA)
<br /> O www.chenmoore.com
<br /> • 3-10
<br /> 0
<br />
|