Laserfiche WebLink
0 <br /> 0 <br /> ® CHENM00RE <br /> ® sissocaus <br /> 0 <br /> • Jose Luis Acosta, PE <br /> ® Project Manager <br /> O Education Sunny Isles Beach. The site is located at <br /> O Masters of Business Administration, Master of 18115 North Bay Road. The project included <br /> Business Administration, Auburn University, full design services for the city orchestrating <br /> • 2003 park planning, paving, grading, drainage, <br /> O Bachelor of Science, Civil Engineering, water, sewer, irrigation, landscape <br /> University of Miami, 1999 architecture, architectural design, <br /> • Bachelor of Science, Architectural government permitting and construction <br /> ® Engineering, University of Miami, 1999 administration services on a limited site. The <br /> project included off-site drainage <br /> 0 Registration improvements and coordination with adjacent <br /> O Professional Engineer, Florida, 63827, 2004 projects in construction. Amenities of the <br /> Natl. Council of Examiners for Eng. & park include the following: baseball field; <br /> 0 Surveying, 41987 recreation building and gym with a <br /> • multipurpose court; playground area and <br /> 11. <br /> Professional Affiliations structure. This project represents Mr. Acosta's <br /> • American Society of Civil Engineers experience while employed with another firm. <br /> O • Cuban American Association of Civil <br /> O Engineers Miami Beach City Center Right-of-Way <br /> • Florida Engineering Society Improvement Project. Chen Moore and <br /> • • National Society of Professional Associates is the prime consultant and was <br /> O Engineers responsible for providing surveying, planning, <br /> • Society of Military Engineers geotechnical investigation, design, permitting, <br /> 0 • Urban Land Institute preparation of construction documents, bid <br /> and award and construction engineering and <br /> O Certifications inspection services for infrastructure <br /> • Stormwater Management Inspector improvements within the public right of way <br /> areas of the City Center neighborhood of <br /> 0 Summary Miami Beach. The project encompasses <br /> O Jose Acosta, P.E. is a project manager and approximately 24,000 LF of ROW <br /> O <br /> leads Chen Moore and Associates' Miami infrastructure improvements including water <br /> office. Mr. Acosta has over 12 years of main replacements, sanitary sewer upgrades, <br /> O experience directing and performing the stormwater drainage improvements, paving & <br /> design of site civil engineering plans/tasks, grading, streetscaping enhancements, <br /> 0 including paving, drainage, water, landscaping improvements, lighting <br /> O wastewater, roadway, and signing and improvements, and roadway reconstruction. <br /> O marking for several municipalities throughout This project also required extensive <br /> Miami-Dade, Broward and Palm Beach coordination with the Public, adjacent CRAs, <br /> O Counties. historic districts and various regulatory <br /> agencies. <br /> ® Project Experience <br /> O Sunny Isles Beach Active Park (Pelican Pinecrest SW 60th Avenue Sidewalk. <br /> O Community Park). The 2.5-acre active park Chen Moore and Associates prepared sidewalk <br /> site design was designed to become the expansion plans for over 2 /2 miles of <br /> O premier recreational park for the City of sidewalk within an existing wooded estate <br /> 0 <br /> O RFQ# 12-04-02 <br /> ® Continuing Professional Architectural & Engineering Services Firms Only (CCNA) <br /> O www.chenmoore.com <br /> • 3-10 <br /> 0 <br />