My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Chen Moore
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:00:52 PM
Creation date
2/2/2016 1:41:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> • <br /> • CHEN*M00RE <br /> ® &ASSOCIATES <br /> O residential community and within close approximately 19,000 LF of ROW <br /> • proximity to Pinecrest Elementary School. The infrastructure improvements including water <br /> • design included traffic/roadway modifications, main replacements, stormwater drainage <br /> ADA grading considerations along with a improvements, paving & grading, <br /> • significant effort to balance the Miami-Dade streetscaping enhancements, landscaping <br /> O County Public Works specifications with the improvements, lighting improvements, and <br /> residents' requests to protect the existing roadway reconstruction. This project also <br /> 0 mature tree canopy. The project included required extensive coordination with the <br /> O rights-of-way within the Village of Pinecrest public, adjacent CRAs, historic districts and <br /> and the City of Coral Gables. The plans were various regulatory agencies. <br /> W permitting via both municipalities and Miami- <br /> • Dade County Public Works. Services included As part of the proposed stormwater and <br /> bidding assistance, meetings with each drainage services, extensive analysis was <br /> 0 resident adjacent to the project, construction conducted utilizing ICPR Modeling and GIS to <br /> ® observation/inspection and project closeout meet and/or exceed required stormwater <br /> B services. Level of Services standards. The proposed <br /> stormwater design included the introduction <br /> O Miami Lakes Lake Patricia Roadway & of catch basins and stormwater piping to <br /> Drainage Improvements. Chen Moore and effectively collect and route the stormwater to <br /> O Associates is implementing drainage sixteen drainage gravity wells with overflow <br /> O improvements identified on the most recent outfall connections to Biscayne Bay. Due to <br /> Town of Miami Lakes Stormwater Master Plan the environmental sensitivity of Biscayne Bay <br /> O for approximately one square mile of an design and implementation of water quality <br /> ® existing residential neighborhood near Lake treatment measures was an important <br /> 0 <br /> Patricia in southern Miami Lakes near Ludlam consideration and design factor of the system <br /> Road. Services include utility coordination, prior to outfall to the Bay and was closely <br /> O schematic and final design phases, coordinated with regulatory agencies during <br /> 0 <br /> government permitting, bidding assistance, the permitting process. <br /> construction administration and statements of <br /> O work completion. The final design included Miami Gardens NW 191st Street Drainage <br /> O approximately 1,900 LF of exfiltration trench Improvements. Chen Moore and Associates <br /> and rehabilitation/upsizing of 6 existing (CMA) was asked by the City of Miami <br /> ® outfalls. CMA is also assisting Miami Lakes Gardens to design the stormwater <br /> 0 with the acquisition of potential grant improvements for the residential area from <br /> opportunities. NW 9th Avenue to NW 10th Place and from <br /> O NW 191st Street to NW 193rd Street. The <br /> • Miami Beach - South Pointe Phase design had a total construction budget of over <br /> III/IV/V - ROW Improvement Project. $400,000 per a grant received by the City. <br /> • Chen Moore and Associates is the prime CMA evaluated the existing site conditions to <br /> O consultant and is responsible for providing strategically design roadway, drainage and <br /> surveying, planning, geotechnical sidewalk improvements to meet the most <br /> • investigation, design, permitting, preparation critical needs of the City and maximize the <br /> O of construction documents, bid and award and value of their construction budget. The <br /> construction engineering and inspection design considered elements related to the <br /> 0 services for infrastructure improvements pedestrian paths and parallel parking <br /> O within the public right of way areas of the adjacent to Norland High School. The project <br /> South Pointe III/IV/V neighborhood of Miami scope included government permitting, <br /> • Beach. The project encompasses bidding services and construction <br /> 0 <br /> • RFQ# 12-04-02 <br /> Continuing Professional Architectural & Engineering Services Firms Only (CCNA) <br /> O www.chenmoore.com <br /> ® 3-ll <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.