My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Chen Moore
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:00:52 PM
Creation date
2/2/2016 1:41:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> 0 <br /> ® CHENMOORE <br /> ® i assocwhs <br /> O infrastructure improvements including water Pinecrest Pinecrest Pine Needle Lane & <br /> 0 main replacements, stormwater drainage Rock Garden Lane Stormwater Analysis <br /> O improvements, paving & grading, Study. CMA is currently providing a <br /> streetscaping enhancements, landscaping stormwater analysis study of a +/- 90 acre <br /> 0 improvements, lighting improvements, and residential area within the Village of Pinecrest <br /> O roadway reconstruction. Additionally, due to to address resident concerns regarding <br /> existing listed contaminated sites within the drainage. The Rock Garden Lane and Pine <br /> 0 proximity of the right of way improvements, Needle Lane basin areas of the Village are <br /> O environmental coordination including closed drainage basins with elevation changes <br /> contaminated sites analysis and consideration of +/- 10 feet from the highest portions of the <br /> 0 of the radius of influence was necessary for basin to the lowest portions and currently <br /> O coordinating dewatering operations. Due to served only with exfiltration trench. Initial <br /> the existing mixed residential and commercial analysis conducted by CMA utilizing LIDAR <br /> O environment of this neighborhood, special data assisted in identifying the basin <br /> O design efforts were made to incorporate boundaries and contributing area to be +/- 90 <br /> 0 <br /> walkable community elements including acres which was previously believed to be <br /> meeting all ADA requirements, providing only +/-37 acres by the Village. Utilizing XP <br /> O street furniture, providing bicycle paths, SWMM modeling, CMA was able to model <br /> 0 <br /> upgrading sidewalks, incorporating specialty existing conditions and show peak stages <br /> treatments at crosswalks, landscaping during various storm events which was <br /> O improvements with specialized tree wells to calibrated utilizing data and observations <br /> provide a walkable surface and bulb outs to during recent storm events. The existing <br /> 0 increase pedestrian friendliness and safety. conditions model developed by CMA <br /> 0 This project also required extensive confirmed that the existing basin areas did <br /> 0 coordination with the public, adjacent CRAs, not meet the Village Stormwater Level of <br /> historic districts and various regulatory Service standard and CMA is currently <br /> O agencies. working with the Village to determine the best <br /> value solutions to meet the Level of Service <br /> ® Miami Beach Sunset Islands 1 & 2 Right- requirements. <br /> O of-Way Improvements. Chen Moore and <br /> O Associates is the prime consultant responsible Miami Gardens YMCA/FC Barcelona <br /> for planning, design, permitting, bid and Soccer Field. CMA worked with Borrelli <br /> • award and construction engineering and Architects to design the demolition, <br /> 0 inspection services for infrastructure earthwork, paving, grading, drainage, <br /> improvements within the public right of way landscape architecture and irrigation plans for <br /> 0 areas of the Sunset Islands I & II a park master plan that included professional <br /> O neighborhood of Miami Beach. The project level soccer field, a baseball field and a multi- <br /> encompasses ± 11,000 LF of ROW purpose field (flag football and soccer) within <br /> • infrastructure improvements including water the existing property adjacent to the existing <br /> O main replacements, stormwater drainage YMCA Miami Gardens facility in Miami <br /> improvements, paving & grading, traffic Gardens. The scope included final design for <br /> O pavement marking and signing related the professional level soccer field including <br /> O enhancements and roadway reconstruction. the earthwork and mainline drainage noted <br /> Extensive coordination with adjacent above. Services include government <br /> 0 residents and with environmental agencies permitting with PERA (formerly DERM) and <br /> O was necessary due to the projects Miami Gardens, bidding assistance, <br /> environmentally sensitive location and construction observation and closeout <br /> 0 surrounding environmental resources. services. <br /> 0 <br /> O RFQ# 12-04-02 <br /> O Continuing Professional Architectural & Engineering Services Firms Only (CCNA) <br /> ® www.chenmoore.com <br /> O 3-18 <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.