Laserfiche WebLink
• CHEN:MODRE <br /> ® kAisocwiFs <br /> 0 Peter J. Duero, PE <br /> ® Associate Engineer <br /> • Education Miami Beach City Center Right-of-Way <br /> Bachelor of Science, Civil Engineering, Improvement Project. Mr. Duero was <br /> ® University of Florida, 2006 responsible for planning, pavement marking <br /> and signage, streetscape, water main design, <br /> Registration permitting, and cost estimating. Chen Moore <br /> ® Professional Engineer, Florida, 73781, 2012 and Associates is the prime consultant <br /> ® responsible for the planning, design, <br /> ® Professional Affiliations permitting, and construction administration <br /> • American Society of Civil Engineers for enhancements within the public right of <br /> ® • Florida Engineering Society way areas of Lincoln Road between <br /> • • Southeast Civil Gators Washington Avenue and Collins Avenue for <br /> the City of Miami Beach. The project included <br /> ® Summary extensive public coordination due to the high <br /> ® <br /> Mr. Duero currently serves as a senior profile nature of this segment of Lincoln Road. <br /> engineer with Chen Moore and Associates. Unique sidewalk/crosswalk materials and <br /> ® He is currently a project engineer on the City patterns were utilized along with specialized <br /> ® Center and South Pointe Right of Way tree wells, a proposed median and extensive <br /> Improvement Projects for the City of Miami landscaping with uplighting to provide a <br /> ® Beach. He has also worked as a project pedestrian friendly environment and <br /> ® engineer in neighborhood improvement distinctive look to this prominent area of the <br /> projects for the Cities of Dania Beach, North City. In addition to the streetscape elements, <br /> 0 Miami Beach, Key West, and Pinecrest, as new bus stop areas and shelters, stormwater <br /> ® well as Miami-Dade DERM. His experience drainage improvements and roadway <br /> includes planning, pavement marking and resurfacing are proposed. The project <br /> ® signage, streetscape, stormwater modeling required extensive coordination with FDOT <br /> ® and design, water main design, permitting, due to improvements proposed along Collins <br /> and cost estimating. Avenue (State Road) and the specialized <br /> ® materials specified. <br /> ® Project Experience <br /> North Miami Beach NE 168th Street Miami Beach South Pointe Phase <br /> ® Right-of-Way Improvements. Mr. Duero III/IV/V — Right-of-Way Improvement <br /> ® was responsible for planning, pavement Project. Mr. Duero was responsible for <br /> marking and signage, streetscape, planning, pavement marking and signage, <br /> ® stormwater modeling and design, and cost streetscape, stormwater modeling and <br /> ® estimating. Chen Moore and Associates design, permitting, and cost estimating.. <br /> designed stormwater improvements, Chen Moore and Associates is responsible for <br /> ® traffic/roadway modifications, sidewalks with providing surveying, planning, geotechnical <br /> ® ADA grading considerations and on-street investigation, design, permitting, preparation <br /> • parking improvements for the mixed use of construction documents, bid and award and <br /> W neighborhood of North Miami Beach. Services construction engineering and inspection <br /> ® included survey, geotechnical investigation, services for infrastructure improvements <br /> design, permitting, bidding assistance and within the public right of way areas of the <br /> W limited construction observation services. South Pointe III/IV/V neighborhood of Miami <br /> ® Beach. The project encompasses <br /> ® approximately 19,000 LF of ROW <br /> ® RFQ# 12-04-02 <br /> ® Continuing Professional Architectural & Engineering Services Firms Only (CCNA) <br /> • www.chenmoore.com <br /> O 3-17 <br />