|
• CHEN:MODRE
<br /> ® kAisocwiFs
<br /> 0 Peter J. Duero, PE
<br /> ® Associate Engineer
<br /> • Education Miami Beach City Center Right-of-Way
<br /> Bachelor of Science, Civil Engineering, Improvement Project. Mr. Duero was
<br /> ® University of Florida, 2006 responsible for planning, pavement marking
<br /> and signage, streetscape, water main design,
<br /> Registration permitting, and cost estimating. Chen Moore
<br /> ® Professional Engineer, Florida, 73781, 2012 and Associates is the prime consultant
<br /> ® responsible for the planning, design,
<br /> ® Professional Affiliations permitting, and construction administration
<br /> • American Society of Civil Engineers for enhancements within the public right of
<br /> ® • Florida Engineering Society way areas of Lincoln Road between
<br /> • • Southeast Civil Gators Washington Avenue and Collins Avenue for
<br /> the City of Miami Beach. The project included
<br /> ® Summary extensive public coordination due to the high
<br /> ®
<br /> Mr. Duero currently serves as a senior profile nature of this segment of Lincoln Road.
<br /> engineer with Chen Moore and Associates. Unique sidewalk/crosswalk materials and
<br /> ® He is currently a project engineer on the City patterns were utilized along with specialized
<br /> ® Center and South Pointe Right of Way tree wells, a proposed median and extensive
<br /> Improvement Projects for the City of Miami landscaping with uplighting to provide a
<br /> ® Beach. He has also worked as a project pedestrian friendly environment and
<br /> ® engineer in neighborhood improvement distinctive look to this prominent area of the
<br /> projects for the Cities of Dania Beach, North City. In addition to the streetscape elements,
<br /> 0 Miami Beach, Key West, and Pinecrest, as new bus stop areas and shelters, stormwater
<br /> ® well as Miami-Dade DERM. His experience drainage improvements and roadway
<br /> includes planning, pavement marking and resurfacing are proposed. The project
<br /> ® signage, streetscape, stormwater modeling required extensive coordination with FDOT
<br /> ® and design, water main design, permitting, due to improvements proposed along Collins
<br /> and cost estimating. Avenue (State Road) and the specialized
<br /> ® materials specified.
<br /> ® Project Experience
<br /> North Miami Beach NE 168th Street Miami Beach South Pointe Phase
<br /> ® Right-of-Way Improvements. Mr. Duero III/IV/V — Right-of-Way Improvement
<br /> ® was responsible for planning, pavement Project. Mr. Duero was responsible for
<br /> marking and signage, streetscape, planning, pavement marking and signage,
<br /> ® stormwater modeling and design, and cost streetscape, stormwater modeling and
<br /> ® estimating. Chen Moore and Associates design, permitting, and cost estimating..
<br /> designed stormwater improvements, Chen Moore and Associates is responsible for
<br /> ® traffic/roadway modifications, sidewalks with providing surveying, planning, geotechnical
<br /> ® ADA grading considerations and on-street investigation, design, permitting, preparation
<br /> • parking improvements for the mixed use of construction documents, bid and award and
<br /> W neighborhood of North Miami Beach. Services construction engineering and inspection
<br /> ® included survey, geotechnical investigation, services for infrastructure improvements
<br /> design, permitting, bidding assistance and within the public right of way areas of the
<br /> W limited construction observation services. South Pointe III/IV/V neighborhood of Miami
<br /> ® Beach. The project encompasses
<br /> ® approximately 19,000 LF of ROW
<br /> ® RFQ# 12-04-02
<br /> ® Continuing Professional Architectural & Engineering Services Firms Only (CCNA)
<br /> • www.chenmoore.com
<br /> O 3-17
<br />
|